Blue Sky Network HawkEye 6200 Installation Manual

Advertisement

Activation

Unless otherwise stated in the quotation at the time of purchase, equipment is activated on
the date of shipment so it is ready to go when you receive the product.
In case your device has not been activated prior to shipment, please have the administrator
of your account submit an activation request using the steps below. The administrator is the
contact name listed on your service agreement. For security purposes, we will only activate
devices upon the request of the administrator.
1.
Locate your Iridium IMEI number (see image below).
2.
Go to
www.blueskynetwork.com
Request
under
form)
3.
Fill out all required information, including your acknowledgement of our service terms
and conditions.
4.
Please allow 1-2 hours for activation to be completed. If your request is out of business
hours (Monday-Friday from 8am-5pm PST), after-hour fees will apply.

Installation

The HawkEye 6200 is easy to install. It offers three different types of installation.
Tube/railing mounting.
Magnet mounting on deck or rooftop.
Screw mounting on deck or rooftop.
The HawkEye 6200 shall always be installed in a horizontal position with no obstructions to the
sky (clear view).
The connection cable shall be routed and fixed properly to avoid dangerous situations that
might occur due to loose cables. Proper installation shall be carried out for all of the
mounting options.
Blue Sky Network |
5333 Mission Center Rd, Suite 220 | San Diego, CA 92108, USA | +1 858 551 3894 | sales@blueskynetwork.com | www.blueskynetwork.com
HawkEye 6200 Installation Guide
, click on
Support
Menu. (Direct link:
Customer
Support, and then click
https://support.skyrouter.com/activation-
Activation
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HawkEye 6200 and is the answer not in the manual?

Questions and answers

Summary of Contents for Blue Sky Network HawkEye 6200

  • Page 1 Screw mounting on deck or rooftop. • The HawkEye 6200 shall always be installed in a horizontal position with no obstructions to the sky (clear view). The connection cable shall be routed and fixed properly to avoid dangerous situations that might occur due to loose cables.
  • Page 2 Magnet Mounting Installation Hold the HawkEye 6200 with both hands, tilt the HawkEye 6200 approximately 45 degrees as shown below. Then lower it onto the steel surface and turn the HawkEye 6200 until the magnets make contact with the steel surface.
  • Page 3 Electrical Installation with No BIC Box After power-up, the HawkEye 6200 will send a first GPS position automatically to confirm the unit is switched on and working properly. Please note that it can take several minutes before a message from the unit is received (depending on satellites in sight).
  • Page 4 The BIC box has two LED indicators for power and system status. The blinking sequence of the four most common statuses are printed on the foil. Blue Sky Network | 5333 Mission Center Rd, Suite 220 | San Diego, CA 92108, USA | +1 858 551 3894 | sales@blueskynetwork.com | www.blueskynetwork.com...
  • Page 5 V+ IN 8-36Vdc / 1A Max. White V- IN Yellow/Green Shield DC isolated from 0V Blue Sky Network | 5333 Mission Center Rd, Suite 220 | San Diego, CA 92108, USA | +1 858 551 3894 | sales@blueskynetwork.com | www.blueskynetwork.com...
  • Page 6 V IN- Support Thank you again for choosing Blue Sky Network for your satellite communication needs. We are committed to providing you with unsurpassed customer care. Our product experts are available to answer any questions you may have and offer technical support 24 hours a day, +1 858-551-3894 seven days a week.

Table of Contents