ABB Totalflow microFLO G4 Startup Manual page 2

Flow computer
Table of Contents

Advertisement

Intellectual Property & Copyright Notice
©2012 by ABB Inc., Totalflow Products ("Owner"), Bartlesville, Oklahoma
74006, U.S.A. All rights reserved.
Any and all derivatives of, including translations thereof, shall remain the
sole property of the Owner, regardless of any circumstances.
The original US English version of this manual shall be deemed the only
valid version. Translated versions, in any other language, shall be
maintained as accurately as possible. Should any discrepancies exist,
the US English version will be considered final. ABB is not liable for any
errors and omissions in the translated materials.
Notice: This publication is for information only. The contents are subject
to change without notice and should not be construed as a commitment,
representation, warranty, or guarantee of any method, product, or device
by Owner.
Inquiries regarding this manual should be addressed to ABB Inc.,
Totalflow Products, Technical Communications, 7051 Industrial Blvd.,
Bartlesville, Oklahoma 74006, U.S.A.
Introduction
NOTE: The µFLO
requirements for installation in a classified hazardous location.
Refer to the ABB installation drawing that is indicated on the
unit's name plate and local and national electrical codes for
installation requirements in classified hazardous locations.
This is a quick start guide designed for typical installations only.
Installations must be performed by personnel knowledgeable with the
ABB Totalflow® µFLO
with the installation requirements per local and national electrical codes.
The user needs to read and understand the contents of this startup guide
prior to beginning installation of the equipment. If there are questions that
are not answered in this guide or other provided documentation, call the
local ABB Totalflow representative or call the number listed on the back
page of this guide.
Assumptions
G4
As the µFLO
scenarios, there can be several different installation configurations that
can be performed and are based on the user's specific site needs. For
the purpose of this guide, the following will look at one possible standard
configuration that is based on a common site scenario. If the presented
scenario differs from the user's specific site needs, please reference the
G4
µFLO
User's Manual for additional scenario information.
G4
Flow Computer Startup Guide does not address any
G4
flow computer, the µFLO
was designed for adaptability in a multitude of different
G4
User's Manual and

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents