Page 1
EES 30 EES 66 EES 40 EES 80 EES 52 EES 120 United Kingdom & Ireland ELECTRIC HOT WATER STORAGE HEATERS Installation, User and Service Manual Innovation has a name.
In case of failures ...................... 12 WARRANTY ......................13 General warranty ....................... 13 Tank warranty ......................13 Conditions of installation and use ................13 Exclusions ......................... 13 Extent of the warranty ....................14 Claims ........................14 Obligations for A.O. Smith ..................14...
substances that are to be recycled. Please GENERAL take the local laws with respect to waste processing into account when disposing of Description of the apparatus old and discarded devices. The construction and equipment of the Never dispose of your old device through the electric storage heater meet the European domestic waste, but bring it to a municipal standards for electric household apparatus...
1.3.1 Dimensions Description Unit EES 30 EES 40 EES 52 Total height 1110 1370 Diameter of the apparatus Height of drain tap Height of T&P plug 1210 Connection cold water 3 /4 " - 14 NPT 3 /4 " - 14 NPT 3 /4 "...
1.3.2 Technical Data Type Unit EES 30 EES 40 EES 52 Tankage Number of elements Capacity (220 V) Capacity (240 V) Heating time up to 60°C * 159/134 214/180 263/221 (220/240 V) Heating time up to 40°C * 95/87 129/118...
1.3.3 EcoDesign Data Description unit EES 30 EES 40 EES 52 Load Profile Energy Efficiency Class Water Heating Efficiency 39.3 38.0 38.0 Daily Electricity Consumption 11.907 12.394 20.320 Daily Fuel Consumption kWh GCV 0.000 0.000 0.000 Mixed Water 40°C (V40) ltr.
Safety thermostat of two poles Regulating thermostat (with priority switch) Heating elements Regulating thermostat Wiring diagram for non-simultaneous use of heating elements Scope: EES 30, EES 40, EES 52, EES 66, EES 80, EES 120 Power supply: 220-240 V 50-60 Hz IP40...
Putting into operation will be in operation and start to work, automatically. 2.3.1 Filling of the heater 2.3.3 Putting out of operation 1. Install the drain tap and check whether it is closed. 1. For short periods: Remove the plug from 2.
Maintenance Measures to be taken at moments of failures At least once a year, the heater will have to Whenever there is a failure, the items given be checked and cleaned by an expert, to below will have to be checked before calling guarantee its good function.
2.5.5 Measures Trouble Cause Measures to be taken Insufficient or no hot water The temperature is set too low Adjust the regulating thermostat at all higher The safety thermostat is Press the reset button interrupting the electric circuit There is no hot water supply left Reduce the hot water consumption.
another intervention of the safety thermostat, FOR THE USER with the regulating thermostat being adjusted Installing and putting into operation the at a high temperature, this last one will have heater for the first time will have to be done to set at a lower temperature.
A.O. Smith, a water heater with an inlet combination, approved by an delivered by A.O. Smith turns out to have a authorized body, of sufficient capacity, steel glass-lined tank that is leaking as a...
A.O. Smith. The examination of the water heater as referred to in the Articles 1 and 2 will take place in an A.O. Smith laboratory. Obligations for A.O. Smith In relation to its water heaters or else the...
Page 16
Your Installer Nederland United Kingdom A.O. Smith Water Products Company B.V. A.O. Smith Water Heaters Postbus 70 Unit B8 Armstrong Mall, Southwood Business Park, Farnborough, 5500 AB VELDHOVEN Hampshire, GU14 0NR 0800 - AOSMITH (2676484) 0870 - AOSMITH (267 6484) info@aosmith.nl...