4. While installing the pump The size of the pit must be at appropriate dimensions to prevent frequent operation and the floater should be adjusted carefully. 5. Electrical Connection The pumps must be used with an ETNA Evo -1/7.5 electrical panel.
• Use the pump within the usage limits defined on the label. • Protect the pump against freezing. • Protect the pump against potential blockages. • We recommend that you wear gloves during any action conducted on the pump. www.etna.com.tr...
9. Troubleshooting The motor starts running but the pump does not transfer. Make sure that water level is not very low and the suction nozzle or the discharge pipe is not clogged. If the transfer of the pump is reduced. Check for blockages and check the accuracy of the rotation direction on the three-phase models.
Page 5
12. Accessories Sledge upper fixation bracket Pump and sledge slider Sledge sole bracket MODEL CONNECTION DIAMETER SUITABLE PUMP MODELS Sledge System G2” EFP30 - EFP30D Mounting Kit www.etna.com.tr...
Page 7
620x585 so that the sledge well cover supplied by our firm can be mounted. Cover chassis is fitted into the well top, and doweled from inside. ** Alternative connection L50*50 ANGLE BRACKET CONCRETE WELL EARTH UNIT(S) www.etna.com.tr FOSEPTİK POMPASI KIZAĞI KUYU MONTAJI...
Page 8
Turkey, and customer-oriented after-sales service approach (commissioning, maintenance and repair, spare part supply). Dudullu Organize Sanayi Bölgesi 2. Cadde No: 14 34775 Ümraniye-Istanbul / Turkey Tel: +90 (216) 561 47 74 (Pbx) • Fax: +90 (216) 561 47 50 www.etna.com.tr • info@etna.com.tr customer service...