Navico MN000802A-G Installation Manual page 25

2 kw radar
Table of Contents

Advertisement

Remove the shield cover from the underside of the main unit to expose the connector locations
and ground terminal location.
The broken line shows the route for the interconnection cable.
Identify the connector ends B, C, and D on the 2 kW interconnection cable (NS003101).
Connector D is an Earthing strap.
Place the locking nut, gasket A and gasket B over the end of the interconnection cable in the
order shown, then push the interconnection cable through the cable entry point into the radome.
(Ensure that you push through sufficient cable to easily connect the connectors.)
At the cable entry point, take care that the grooves in gaskets A and B are opposite each other
(see the figure). Tighten the locking nuts to hold the interconnection cable firmly in place and to
provide a waterproof seal.

Advertisement

Table of Contents
loading

Table of Contents