Performance With Heatsink At The Back - Infineon D2 PAK User Manual

Full-bridge converter for ups
Table of Contents

Advertisement

Full-bridge converter for UPS
2
2
D
PAK/ D
PAK-7 kit
UG_1801_PL16_1802_225559
1.5.2

Performance with heatsink at the back

Figure 11
Front thermal image after 1 hour
As shown in Figure 12, the corner temperature reading (A) is 1°C higher than that with the heatsink at the front in
Figure 6. The corner temperature reading (B) as shown in Figure 13 is 2°C higher than that with the heatsink at
the front in Figure 7. It indicates that the heatsink placed at the front is slightly more effective. Its average
efficiency is 96.4 percent, shown in Table 2, which is 0.1 percent lower than that shown in Table 1 with the
heatsink at the front. The higher efficiency is consistent with lower temperature readings at locations A and B,
shown in Figures 6, 7, 12 and 13.
The PCB temperature readings shown in Figure 12 at locations C and D show 3°C difference, which indicates that
source bond wires result in additional power loss.
Figure 12
Back thermal image after 1 hour
User Guide
D: 57°C
C:60°C
69°C
54°C
(top)
55°C
(bottom)
A: 46°C
B: 47°C
50°C
10
7 0 .0 °C
60
40
20
2 0 .0 °C
7 0 .0 °C
60
40
20
2 0 .0 °C
Revision 1.0
2018-03-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

D2 pak-7

Table of Contents