Advertisement

1. Introduction
· This Installation manual contains information regarding the installation and the safe handling method
of the photovoltaic module (hereafter referred to as "module") supplied by Hyundai Heavy Industries
Green Energy Co., Ltd. (hereafter referred to as "HHIGE").
· System Users and Installers should read and understand this manual before handling, installing the
module. For any questions, please contact Customer Support department or our local representatives
for more detailed information.
· Before installing a solar photovoltaic system, mechanical and electrical requirements for the total
system should be checked as well. Keep this manual in a safe place for future reference.
· The installer should conform to every safety precautions specified in this manual and local codes
when installing a module.
· HHIGE modules are tested and certified for installation worldwide. Different regions may have
different regulations for solar PV installations. In this manual, hereafter "IEC only" is used to refer to
regions where IEC standard applies, e.g. Europe, Middle East, most of Asia Pacific countries; "UL
only" is used to refer to regions where UL standard applies, e.g. United States, Canada; all other
references are global.

2. General Information

This manual provides the installation information for HHIGE modules. Each individual module has a
unique serial number.
Serial number : YYMMDD-XX-M(S)xxxXX-0001(~9999) (Ex. 140317-21-S260RG-0001)
· YYMMDD : Production date
· XX : Internal admin number
· M(S)xxxXX : Model (xxx : Peak power at STC(Pmax)[W], XX : RF/RG/RI/TF/TG/TI)
· 0001(~9999) : Serial number
2.1 Disclaimer of Liability
1) HHIGE does not have any responsibility and liability for clause as below.
· Loss, damage, injury or expense resulting from improper installation, handling or use. The
installation techniques, handling and use of this product are beyond company control.
· Infringement of any third party's patent or right that is caused by using HHIGE modules.
· Loss, damage, injury or expense resulting from any factor that is unsuspected the module was
produced or shipped.
2) HHIGE reserves the rights for any change the technical specification including the PV production, the
specifications, or the product information sheets without prior notice.
Sales Office
Bundang First Tower, 55, Bundang-ro.,
Bundang-gu, Seongnam-si, Gyeonggi-do
13591, Korea

INSTALLATION MANUAL

Effective April 4, 2017
Page 1 of 18
www.hhigreen.com
Factory
313, Soi-ro, Soi-myeon, Eumseong-gun,
Chungcheongbuk-do 369-872, Korea

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HIS-M210RF and is the answer not in the manual?

Questions and answers

Summary of Contents for Hyundai HIS-M210RF

  • Page 1: Installation Manual

    1. Introduction · This Installation manual contains information regarding the installation and the safe handling method of the photovoltaic module (hereafter referred to as “module”) supplied by Hyundai Heavy Industries Green Energy Co., Ltd. (hereafter referred to as “HHIGE”). · System Users and Installers should read and understand this manual before handling, installing the module.
  • Page 2 www.hhigreen.com 2.2 Notice · Installing solar photovoltaic systems requires specialized skills and knowledge, and should only be performed by qualified persons. · Each module has a junction box for permanent cable connection. HHIGE can provide customers with fitted cables for easy installation. Installers should secure the safe installation status including all electrical hazards.
  • Page 3: General Safety

    www.hhigreen.com · In order to prevent any performance drop, damage, or incapability, do not use paint and adhesive material to the module surface. · Do not leave modules in places where flammable gases can be generated or collected. · Do not leave un-fixed and unsafe PV modules unattended. ·...
  • Page 4: Notes On Installation

    www.hhigreen.com 3.2 Notes on Installation · Space between PV module frames and installation objects is necessary for cooling air circulation. Do not seal this space. · Minimum 4 inch (10.14cm) of standoff height is necessary based on UL Fire Performance Type1 or Type2.
  • Page 5: Mounting Method

    www.hhigreen.com installer should check salt damage of the installed area. · PV modules shall not be immersed in water and shall not be continually exposure to Water from a sprinkler, fountain, etc. · PV modules shall not be installed in sulfurous area near sulfurous volcano and sulfurous spring. ·...
  • Page 6 www.hhigreen.com J-BOX GROUND HOLE 4 x Ø 7-L11 MOUNTING HOLE MOUNTING HOLES ±20 Ø 7 SLOT THRU GROUND HOLE 1200mm 4mm 1200mm 4mm CABLE AND CABLE AND CONNECTOR CONNECTOR GROUND MARK DETAIL A 4x Ø MOUNTING HOLE GROUND HOLES MOUNTING HOLE GROUND HOLE Picture 2.
  • Page 7 www.hhigreen.com Picture 4. Mounting Hardware Picture 5. Installation Method using clamping Page 7 of 18 Factory Sales Office 313, Soi-ro, Soi-myeon, Eumseong-gun, Bundang First Tower, 55, Bundang-ro, Chungcheongbuk-do 369-872, Korea Jongno-gu, Seongnam-si, Gyeonggi-do 13591, Korea...
  • Page 8: Specifications

    www.hhigreen.com 4. Specifications 4.1 Notes on Specification · Electrical Characteristics : HiS-MxxxRF(TF) (Poly-Crystalline Si Type, 3/4 Bus Bar Type, 54 Cells) Item HiS-MxxxRF(TF) (xxx;Maximum Power Value) Maximum Power at STC(Pmax) [W] Voltage at Pmax (Vmpp) [V] 27.4 27.5 27.6 27.8 27.9 28.0 28.2...
  • Page 9 www.hhigreen.com · Electrical Characteristics : HiS-MxxxRG(TG) (Poly-Crystalline Si Type, 3/4 Bus Bar Type, 60 Cells) Item HiS-MxxxRG(TG) (xxx;Maximum Power Value) Maximum Power at STC(Pmax) [W] Voltage at Pmax (Vmpp) [V] 30.5 30.6 30.7 30.9 31.0 31.1 31.3 31.4 31.5 31.7 31.8 Current at Pmax (Impp) [A] Open circuit voltage (Voc) [V]...
  • Page 10 www.hhigreen.com · Electrical Characteristics : HiS-MxxxRI(TI) (Poly-Crystalline Si Type, 3/4 Bus Bar Type, 72 Cells) Item HiS-MxxxRI(TI) (xxx;Maximum Power Value) Maximum Power at STC(Pmax) [W] Voltage at Pmax (Vmpp) [V] 35.4 35.6 35.8 36.0 36.0 36.2 36.4 36.6 36.8 37.1 37.4 Current at Pmax (Impp) [A] Open circuit voltage (Voc) [V]...
  • Page 11 www.hhigreen.com · Mechanical Characteristics (HiS-MxxxRF(TF)/HiS-SxxxRF(TF)) Description HiS-MxxxRF(TF)/HiS-SxxxRF(TF) 1,480(58.3) +2/-0 Length, mm(inches) 998(39.3) +2/-0 Width, mm(inches) 35 (1.38) ±0.3 Depth, mm(inches) Weight, kg(pounds) 17.4(38.4) · Mechanical Characteristics (HiS-MxxxRG(TG)/HiS-SxxxRG(TG)) Description HiS-MxxxRG(TG)/HiS-SxxxRG(TG) 1,640(64.6) +2/-0 Length, mm(inches) Width, mm(inches) 998(39.3) +2/-0 35 (1.38) ±0.3 Depth, mm(inches) 18.7(41.2) Weight, kg(pounds)
  • Page 12: Module Wiring

    www.hhigreen.com ※ UL Fire Rating The modules in the specified construction site shown by table below, when used with a listed mounting system that has been rated as a Class A System or when installed with type 1 or type2 modules, is suitable to maintain the System Class A Fire Rating.
  • Page 13: Earth Ground Wiring

    www.hhigreen.com 5.4 Earth Ground Wiring To prevent electric shock and fire, an earthing must be done on the frames of PV modules and array. The array frame must be earthed according to NEC Article 250 (USA) or CEC (Canada). 1) Grounding hardware There is an earthing hole in the module frame;...
  • Page 14 www.hhigreen.com 5.5 Module Terminations The installer should connect cables using the same cable connector equipped in Each PV module. For more information about electrical connection, contact an authorized engineer of HHIGE. 5.6 Junction Box & Terminals A PV module has the plus and minus connectors and a junction box with bypass diodes. On the junction box, the polarity is clearly marked.
  • Page 15: Operation And Maintenance

    www.hhigreen.com 5.7 Conduit For conduit application, it is necessary to follow the regulation for outdoor installation of conduit. All fixing parts should be protected from any damage and moisture. 6. Diodes When there is partial shade on a PV module, reverse-voltage can occur inside PV module. In order to protect this phenomenon, the diodes are normally installed in a Junction Box.
  • Page 16 www.hhigreen.com J-BOX GROUND HOLE 160±20 8 x Ø 7-L11 MOUNTING HOLES 2 MOUNTING HOLES GROUND HOLE 1000mm 4mm 1000mm 4mm CABLE AND CABLE AND CONNECTOR CONNECTOR GROUND MARK 2 MOUNTING HOLES 4 x Ø 4.2 GROUND HOLES 2 MOUNTING HOLES GROUND HOLE 35±0.3 Ø...
  • Page 17 www.hhigreen.com J-BOX GROUND HOLE 4 x Ø 7-L11 MOUNTING HOLE MOUNTING HOLES ±20 GROUND HOLE 1200mm 4mm 1200mm 4mm CABLE AND CABLE AND CONNECTOR CONNECTOR GROUND MARK 4x Ø GROUND HOLES MOUNTING HOLE MOUNTING HOLE GROUND HOLE 50±0.3 11.0 11.0 Ø...
  • Page 18 S/8≤ Clamping Area ≤S/4 Note 1) The certified mounting method is bolting method by VDE 2) The Mounting method has been qualified by Hyundai Heavy Industries Green Energy, and the mechanical load tests are based on IEC61215 ed.2. Page 18 of 18...

Table of Contents