Mounting the ApexEL Base Unit (ABU)
Align the mounting bracket template.
Mark the holes and attach the ApexEL.
Template & Tips
Allow approximately 2-3" clearance below the ABU for cables
If mounting the ApexEL into Sheetrock or concrete, please use the proper
mounting hardware (not supplied)
Need help?
Do you have a question about the APEXEL and is the answer not in the manual?