1
Confirm all components received.
Open the Switched Junction Box by removing the
2
two Phillips-head screws from the back panel.
When installed, the Switched Junction Box should align flush with the front edge of a run of
3
luminaires. The 3-pin connector comes positioned for installing on the right end of a run. For
installations on the left end of a run, you must move the connector.
To move the connector:
Remove the end plate from its slot, and the 3-pin connector from the end plate.
Move the connector to the other slot. (Make sure that the arrow on the end plate is oriented up).
Insert the connector in the end plate, and the end plate into the slot, ensuring that the connector
clicks securely in place.
2 eW Profile Powercore gen4, Switched Junction Box Installation Instructions
Need help?
Do you have a question about the eW Profile Powercore gen4 and is the answer not in the manual?
Questions and answers