Download Print this page

Advertisement

Quick Links

1
90°
3
5 - 6
ROTATIONS
Turn the prep tool five or six full and continuous revolutions
around the coax. Do not reverse the direction of the turn, it
is unnecessary and can damage the braid.
4
TRI-SHIELD
0.25"
Cutoffs should be 1/4" and
5/16" long.
4
QUAD-SHIELD
Fold back the first
layer of braid wires.
PV6UE-05-Install_12162016_ALB
Cut the end of the
cable cleanly with
sharp cutters at a
90° angle.
Nick Foil
0.3125"
Nick the foil close to the
PVC jacket and begin
peeling the foil.
Nick Foil
Nick outer foil as shown.
U.S. Toll Free 1.866.470.0887
2
Coax against
the stop
Insert the coax into the appropriate cable prep tool so
the end of the coax is flush against the stop.
4
DUAL SHIELD
Remove the foil layer.
Peel off the foil layer.
International +1.501.955.0032
©2016 PerfectVision Manufacturing
PV6UE-05
Installation Guide
0.25"
0.3125"
Do not nick or cut through these wires
It is important to make sure
ALL the braid wires are
folded back neatly.
Fold ALL braid wires
back neatly.
Fold ALL braid wires
back neatly.
www.perfect-vision.com
The two cutoff
sections should
be 1/4" and
5/16" long.

Advertisement

loading

Summary of Contents for PerfectVision PV6UE-05

  • Page 1 QUAD-SHIELD Nick Foil Fold back the first Nick outer foil as shown. Peel off the foil layer. Fold ALL braid wires layer of braid wires. back neatly. PV6UE-05-Install_12162016_ALB U.S. Toll Free 1.866.470.0887 International +1.501.955.0032 www.perfect-vision.com ©2016 PerfectVision Manufacturing...
  • Page 2 Too long Too short The connector will slide down into the coax smoothly if you have aligned everything properly. Compress the connector to 21 mm using the PV-200 tool. PV6UE-05-Install_12162016_ALB U.S. Toll Free 1.866.470.0887 International +1.501.955.0032 www.perfect-vision.com ©2016 PerfectVision Manufacturing...