Table of Contents EZ Way, Inc. Parts Breakdown Monthly Maintenance Checklist Smart Stand ® Operating Instructions Scale Calibration Advanced Smart Stand ® Features Wiring Schematic Trouble-Shooting Guide EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
S800PN Non Scale Parts Diagram EZ Way, Inc. EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
Page 4
Pad Arm Right Stand Premier 800 lb. 50974 Pad Arm Left Stand Premier 800 lb. 11014 Safety Hook Spring 50932 Pad Head Stand 400 lb. 12013 Actuator Assembly - Stand 12706 Hand Control Assembly EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
Page 5
S800PS With Scale Parts Diagram EZ Way, Inc. EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
Page 6
S800PS With Scale Parts List EZ Way, Inc. 800# EZ Smart Stand with Scale Model S800PS ® Item Part No. Description 11842 Switch Emergency Stop Button Lift & Stand 12190 Cover Mast Emergency Stop Switch Stand 12049 Shroud Assembly Smart Stand with Scale...
EZ Way Smart Stand Safety & Maintenance Checklist ® The EZ Way Smart Stand requires a minimum of servicing to keep it in good working order. Nevertheless, it is ® important that certain basic checks be periodically made by maintenance staff to ensure on-going safety throughout the life of the device.
Page 8
If any unusual noises or cracks are found, stop using the stand and call the EZ Way Service Department immediately! ☐ Test the Emergency Stop Switch. If the switch does not stop the stand when activated, call the EZ Way Service Department immediately! ☐...
2. Pressing the Right Toggle Switch will lock the value into memory. 3. Pressing the Left Toggle Switch will back out of the parameter without saving the value. EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
9. When the display leaves this menu selection, it will have been calibrated to the selected weight. Exit the calibration menu. 10. Press “WEIGHT” key to verify calibrated weight to 1% accuracy. Calibration is now complete. EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
3. To override a ‘Weight Overload’, press the down key. The arm will only operate in the down direction during a Weight Overload. Note: This feature is only available on scale units. EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
Page 12
The purpose of the inspection reminder is to notify the customer that the lift or stand needs to be inspected with the ‘EZ Way Safety & Maintenance Checklist’ form (see attached). When the checklist is complete the reminder is to be reset in the Customer Settings Menu as described below.
Page 13
1.3 and changes are made to the original code the next revision of code will display version 1.4. New controls with version 1.8 will have software updates included. EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
Make sure they are not loose. Call Service if voltage is not good and connection is good. Continuous up/down Unhook toggles and airlines from board. If problem still persists call EZ Way Service. EZ Way, Inc. • (800) 627-8940 • Fax (712) 542-1899 • www.ezlifts.com...
Need help?
Do you have a question about the Smart Stand S800PS and is the answer not in the manual?
Questions and answers