Download Print this page

Festo FEC-KBG7 Assembly Instructions page 2

Advertisement

Available languages

Available languages

1. Cable FEC-KBG7
1
6
2. Assembly steps for cable FEC-KBG7 (CPX-FEC side)
Pin assignment Core colour Signal
Pin 2
green
Pin 3
white
Pin 5
brown
Pin 1,4,6-9
not assigned
Housing
screening
4
3. Assembly steps for cable FEC-KBG7 (FED-50 side)
0,4 Nm
4. Pin assignment of cable FEC-KBG7
1 cable
2
FEC-KBG7 (539642)
2 fastening screws
4-4UNC
3 field bus plug
3
FBS-SUB-9-GS-1x9POL-
4
B (534497)
5
4 fastening screws
5 control unit CPX-FEC-...
6 cover
7 assembly instructions
for field bus plug 3
1. For assembly with field
bus plug 3:
1
3
Please note this pin
assignment and these
RxD
assembly instructions 7
TxD
GND
2. Remove the cover 6 from
5
control unit 5.
6
3. Please note the tightening
torque of screws 4 (see
assembly instructions 7).
1. Please note the tightening
2
torque of screws 2.
Assembly instructions (en)
683 381 / 2004-04NH
Cable
FEC-KBG7 / FEC-KBG8
539 642 / 539 643
1. Cable FEC-KBG8
2
1
2. Assembly steps for cable FEC-KBG8 (CPX-FEC side)
0,3 Nm
0,4 Nm
3. Assembly steps for cable FEC-KBG8 (FED-50 side)
0,4 Nm
4. Pin assignment of cable FEC-KBG8
†‡
Festo AG & Co. KG
Postfach
Ruiter Straße 82
73726 Esslingen
++49/(0)711/347-0
www.festo.com
cable
1
2
FEC-KBG8 (539643)
fastening screws
2
3
4-4UNC
locking bolt
3
4-4UNC
4
control unit CPX-FEC-...
4
5/6
cover
5
M3 screws
6
1. Remove cover 5 from
4
control unit 4.
5
2. Remove screws 6 from
4
the sub-D plug.
6
3. Screw in the bolts 3
4
provided.
Lock bolts 3, if neces-
sary, with a screw locking
3
medium.
4. Please note the tightening
2
torque of screws 2.
1. Please note the tightening
2
torque of screws 2.

Advertisement

loading

This manual is also suitable for:

Fec-kbg8