Superrollo GW245 Assembly Manual

Electronic roller shutter belt winder
Table of Contents

Advertisement

Quick Links

Electronic Roller Shutter Belt Winder superrollo GW240 / GW245
EN
Translation of the Original Operating and Assembly Manual
BA10240-2 (02.16)
Item No.:
superrollo GW240
superrollo GW245 *
*
Mini belt
SR10240
SR10245

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GW245 and is the answer not in the manual?

Questions and answers

Summary of Contents for Superrollo GW245

  • Page 1 Electronic Roller Shutter Belt Winder superrollo GW240 / GW245 Translation of the Original Operating and Assembly Manual Item No.: superrollo GW240 SR10240 superrollo GW245 * SR10245 Mini belt BA10240-2 (02.16)
  • Page 2: Dear Customer

    Dear Customer, With your purchase of a roller shutter belt winder superrollo GW240 / GW245, you have chosen a quality product manufactured by superrollo. Thank you for the trust you have placed in us.
  • Page 3: Table Of Contents

    Technical Term - Definition ..........6 options in the main menu ........36 Included in delivery .............7 16.1 Switching automatic mode on/off ........37 Overview of the superrollo GW240 / GW245 ...8 16.2 Setting the switching times (opening and Operating buttons ..............9 closing times) ................38 The display and its symbols ..........10...
  • Page 4: These Instructions

    1.1 Application of this manual ◆ Before you begin, please read this manual through ◆ When passing the superrollo GW240 / GW245 on to completely and follow all the safety instructions. a third party, this manual must be passed on as well.
  • Page 5: Levels Of Danger And Signal Words

    2.1 Levels of danger and signal words CAUTION! DANGER! This hazard may result in minor or moderate This hazard will result in serious injury or death injury if not avoided. if not avoided. WARNING! ATTENTION! This hazard may result in serious injury or death This hazard may lead to property damage.
  • Page 6: Technical Term - Definition

    GW240 / GW245 is switched off, see page 13. Overload cut-off ◆ If the drive jams in the UP ( ▲ ) direction (for exam- ple, due to ice), the superrollo GW240 / GW245 is switched off, see page 13.
  • Page 7: Included In Delivery

    3. Included in delivery Included in delivery 1 x superrollo GW240 or 1 x superrollo GW245 1 x Wall bracket 2 x Assembly screws (4 x 40 mm) 2 x Assembly screws (4.2 x 19 mm) 2 x Wall plugs (S6 x 30 mm)
  • Page 8: Overview Of The Superrollo Gw240 / Gw245

    4. Overview of the superrollo GW240 / GW245 Wall bracket Mounting Belt inlet Reel compartment cover Fastening hook Disengaging bracket Reel Display Operating buttons Drive release Type plate Assembly locking device Setting buttons Mains connection Cover plate Mounting Connection socket for the light sensor...
  • Page 9: Operating Buttons

    4.1 Operating buttons Pos. Symbol Description Up / Stop button ◆ The roller shutter travels upwards ◆ The roller shutter stops Down / Stop button ◆ The roller shutter travels downwards ◆ The roller shutter stops Menu button ◆ Call up the main menu ◆...
  • Page 10: The Display And Its Symbols

    4.2 The display and its symbols Pos. Symbol Description Time / setting parameters Switching automatic mode on/off Direction of travel - up / down Switching times (opening / closing time) Automatic dusk function Automatic solar function Setting the end points Setting the time / date Setting the weekend switching times...
  • Page 11: The Standard Display And The Main Menu

    4.3 The standard display and the main menu The standard display (see example) The main menu Displays the time, no Enables display and automatic functions selection of the individual are active. functions and menus. Displays the time and The selected menu the activated automatic flashes, e.g.
  • Page 12: Functional Description

    5. Functional description Features and The superrollo GW240 / GW245 is an electric roller shutter control options: belt winder designed for use inside. The unit is installed as a surface-mounted device. ◆ Operational demonstrator The power supply is provided via the enclosed connect- ◆...
  • Page 13: Description Of The Safety Functions

    If the drive jams in the UP ( ▲ ) direction (for example, switched off. due to ice), the superrollo GW240 / GW245 is switched off. ◆ First remove the cause of the overload. Once the system has switched off, it is not possible to directly operate the drive in the ◆...
  • Page 14: Conduct In The Event Of Power Failure

    5.2 Conduct in the event of power failure Data retention following a power failure After a power failure the time flashes in the display and the installation wizard is active. All settings are permanently saved. The configured switching times are retained even following extended power failure.
  • Page 15: Technical Specifications

    6. Technical Specifications Power supply Operating conditions Number of switching Supply voltage: 230 V ~ / 50 Hz 4 (up and down) times: Nominal power: 70 W Mains connecting cable: 2 x 0.75 mm (H03VVH2-F) Consumption: Standby: < 0.5 W Permissible ambient tem- 0 °C to +40°C perature:...
  • Page 16: Dimensions

    6.1 Dimensions superrollo GW240 / GW245 Item no.: SR10240 / SR10245 OBEN All dimensions in mm...
  • Page 17: Permissible Roller Shutter Belts

    6.2 Permissible roller shutter belts ATTENTION! The specifications are intended for guidance only and apply to an ideal installation The superrollo GW240 / GW245 may be damaged if situation. excessively long belts are used. The actual values may vary due to local Only use belts of the permissible lengths.
  • Page 18: Safety Instructions

    ◆ Never use defective or damaged equipment. ◆ Carry out all cleaning work on the roller shutters ◆ Check the superrollo GW240 / GW245 and the whilst the device is disconnected from the mains provided mains cable beforehand for damage.
  • Page 19: Intended Use

    7.1 Intended use Only use the manufacturer's original spare parts. Only use the superrollo GW240 / GW245 for opening and closing roller shutters with a permissible belt. ◆ By doing so, you avoid risk of malfunctions and damage to your superrollo GW240 / GW245.
  • Page 20: Improper Use

    Using the superrollo GW240 / GW245 for purposes There is a risk to life caused through short circuiting other than previously mentioned is impermissible. and electric shocks if the superrollo GW240 / GW245 is used outside. ◆ Never install or operate the superrollo...
  • Page 21: Safety Instructions For The Installation

    8. Safety instructions for the installation Poor routing of the belt can cause the belt to fail Incorrect installation can lead to property damage. and leads to unnecessary loads on the superrollo ◆ Strong forces are exerted during operation of the GW240 / GW245.
  • Page 22: Preparation For Installation

    9. Preparation for installation Take measurements. Check that there is sufficient space for the superrollo GW240 / GW245. Remove the old belt winder, if you are carrying out a conversion to an existing roller shutter system. Let the roller shutter move fully down, until the slats are completely closed.
  • Page 23 9. Preparation for installation Prepare the belt. Cut the belt off approx. 20 cm under the mounting position. Fold the end of the belt over by approx. 2 cm and cut a short slit in the centre. This enables you to subsequently hook the belt onto the reel.
  • Page 24: Mounting The Wall Bracket

    10. Mounting the wall bracket Note for mounting on window frames, etc. Draw on the new mounting holes. Hold the wall bracket onto Weak window frames may break. the desired installation ◆ When mounting on window frames, please check position and draw on both their structure and load capacity.
  • Page 25 10. Mounting the wall bracket The letterings "TOP" and "OBEN" on the wall bracket indicates the correct mounting posi- tion. Screw on the wall bracket with the screws provided and ensure that the right side is facing upwards (TOP/ OBEN). Use the correct type of screw depending on the mounting surface, see the 'included in delivery' section on page 7.
  • Page 26: Drawing In And Fastening The Belt

    11. Drawing in and fastening the belt First, plug in the small appliances plug into the mains connection of the superrollo GW240 / GW245 and subsequently the mains plug into the socket. CAUTION! There is a risk of injury from the reel.
  • Page 27 11. Drawing in and fastening the belt Next, draw-in the belt into the superrollo GW240 / GW245 from the top. Feed the belt into the device, as shown in the image, and slide it over the Fastening hook from below.
  • Page 28: Mounting The Superrollo Gw240 / Gw245

    12. Mounting the superrollo GW240 / GW245 Slide the superrollo GW240 / GW245 onto the wall bracket from below until it engages. Otherwise, the superrollo GW240 / GW245 may fall off again. WARNING! A damaged connecting cable may cause a short circuit.
  • Page 29 12. Mounting the superrollo GW240 / GW245 Mount the light sensor (not included, see page 57, Accessories). ◆ Insert the light sensor plug into the designated connection socket on the bottom of the superrollo GW240 / GW245. ◆ Subsequently secure the light sensor to the window pane using the suction cup.
  • Page 30: Introduction To Opening And Setting The Functions

    13. Introduction to opening and setting the functions Open the main menu. Select the desired setting (e.g. On). Pressing the menu button in the standard display causes the main menu to open. By confirming the setting you will return Select the desired menu. to the main menu.
  • Page 31: Initial Commissioning With The Help Of The Installation Wizard

    The automatic functions remain blocked until the end point setting is configured. Readiness for operation The superrollo GW240 / GW245 is ready for use as soon as the installation wizard has finished. In the main menu you can change your settings...
  • Page 32 14. Initial commissioning with the help of the installation wizard The installation wizard appears as soon Set the current date as the plug is plugged into the socket. (day.month) and confirm each entry. All icons and digits in the display will flash. Set the current year and confirm Activate the time setting function.
  • Page 33 Set the upper end point. ATTENTION! Setting the wrong upper end point may lead to overload or damage the superrollo GW240 / GW245 or the drive. ◆ Do not set the upper end point right up to the Press and hold the Up button.
  • Page 34 Set the lower end point. as the final setting is confirmed. Press and hold the Down button. The superrollo GW240 / GW245 is now ready for operation. The roller shutter travels down. Release the Down button, as soon as the roller shutter reaches the desired position for the lower end point.
  • Page 35: Manual Operation

    15. Manual operation Manual operation is possible in any of the modes and has priority over the programmed automatic functions. Open the roller shutters. By briefly pressing the button, the roller shutters will move to the upper end point. Stop the shutters in the interim. Close the roller shutters.
  • Page 36: Description Of The Functions And Setting Options In The Main Menu

    Automatic dusk function (with light sensor) In the main menu, you can call up and set all of the functions for the Automatic solar function (with light sensor) superrollo GW240 / GW245. End point setting Manual operation is not possi- Time and date ble from the main menu.
  • Page 37: Switching Automatic Mode On/Off

    16.1 Switching automatic mode on/off Automatic mode [ On ] Open the main menu. ◆ All previously entered automatic mode functions Select automatic mode and open are active. the menu. ◆ Manual operation is also possible in automatic mode. Automatic mode [ OFF ] ◆...
  • Page 38: Setting The Switching Times (Opening And Closing Times)

    Deactivating the switching times [ OFF ] You can configure four different opening and closing times for the superrollo GW240 / GW245 in order to open Each switching time can be deactivated individually. or close your roller shutters at your preferred times.
  • Page 39 16.2 Setting the switching times (opening and closing times) Set the opening time [ ] for Monday to Friday: Set the opening [ ] and closing time [ ] for ▲ ▲ Saturday and Sunday: Set the desired opening time (hours: minutes) and confirm each entry.
  • Page 40: Setting The Automatic Dusk Function

    16.3 Setting the automatic dusk function The automatic dusk function causes the roller shutters Open the main menu. to close to the lower end point automatically. Select the automatic dusk function and Automatic dusk function with connected light open the menu. sensor At twilight, the roller shutters will lower to the lower end...
  • Page 41 16.3 Setting the automatic dusk function Setting the twilight limit: Set the desired limit. ACTUAL value Currently measured brightness (e.g. 10). "- -" = too bright SET value Configurable set limit 01 = very dark, approx. 2 Lux 15 = less dark, approx. 50 Lux If the set limit value is not met due to the on- set of twilight, the roller shutters will close.
  • Page 42: Setting The Automatic Solar Function

    To do this, the light sensor is secured to the window pane with a suction cup and then plugged into the superrollo GW240 / GW245. Automatic solar function Automatic moving up and down of the roller shutter once a set limit is exceeded.
  • Page 43 16.4 Setting the automatic solar function Automatic lowering If the sensor detects uninterrupted sunlight for 10 10 mins minutes, the shutter will descend until its shadow covers the light sensor. Automatic clearing After approx. 20 minutes, the roller shutter is automatically raised a small amount to uncover the After 20 sensor.
  • Page 44 16.4 Setting the automatic solar function Setting the solar limit value: Open the main menu. Select the automatic solar function and Set the desired limit. open the menu. ACTUAL value Currently measured brightness (e.g. 37). "- -"= too dark Switch the automatic solar function on and confirm the entry.
  • Page 45: Setting The End Points

    16.5 Setting the end points Setting order First move the roller shutters to the centre position. Set the upper end point, see page 33. Set the lower end point, see page 34. Open the main menu. Select the end point and open the menu.
  • Page 46: Set Time And Date

    16.6 Set time and date Set the year, Open the main menu. see page 32. Select the time and date and open the menu. Setting order Set the time (hours: minutes), see page 32. Set the date (day. month), see page 32.
  • Page 47: Erase All Settings, Software Reset

    17. Erase all settings, software reset If necessary, you can erase all of your settings and return This displays the software version for the the superrollo GW240 / GW245 system to its original superrollo GW240 / GW245. factory settings. Example Remove the cover plate from the setting buttons.
  • Page 48: Removing The Superrollo Gw240 / Gw245 (E.g. In The Event Of A Move)

    18. Removing the superrollo GW240 / GW245 (e.g. in the event of a move) Remove the cover plate from the setting buttons. Erase all settings. Simultaneously press and hold the buttons for 4 seconds. Fully close the roller shutters. Continue to press and hold the down button.
  • Page 49 18. Removing the superrollo GW240 / GW245 (e.g. in the event of a move) Remove the reel compartment cover and check the position of the fastening hook. If necessary, move the fastening hook into an easily accessible position. For this, plug the mains cable into the superrollo GW240 / GW245 and into the socket.
  • Page 50: Removing The Belt In The Event Of Unit Failure

    Maintain pressure on the disengaging bracket and pull fails and the motor no longer runs, you can use the the belt out of the superrollo GW240 / GW245 as far as disengaging bracket provided in order to fully remove possible.
  • Page 51: What To Do If

    ... the superrollo GW240 / GW245 indicates Check the power supply incl. connecting cable and plug. no functions? ... the superrollo GW240 / GW245 fails to react at a) There may have been a power failure, see page 14. Reset the the configured switching time? time and date with the help of the installation wizard, see page 32.
  • Page 52 The superrollo GW240 / GW245 is no longer ready for operation. properly either manually or automatically? Carry out a software reset in accordance with the instructions on page 47 and test the superrollo GW240 / GW245 using the default factory settings.
  • Page 53: Information About Maintenance And Care Of Your Equipment

    A lack of maintenance can lead to personal injury through damage to your superrollo GW240 / GW245 and the roller shutter system. ◆ Please check the superrollo GW240 / GW245 and all of your roller shutter components regularly for damage.
  • Page 54: Tractive Force Diagram

    22. Tractive force diagram Belt length [ m ] Lifting weight [Kg] Belt thickness 1.0 mm Belt thickness 1.3 mm Belt thickness 1.5 mm Belt length [m]...
  • Page 55: Factory Settings

    23. Factory Settings Pos. Description Status / settings Automatic operation Switching times (opening / closing time) Opening times (Monday to Friday) 7 am Closing times (Monday to Friday) 8 pm Opening times (Saturday and Sunday) 8 am Closing times (Saturday and Sunday) 10 pm Automatic dusk function Twilight limit value...
  • Page 56: Ce Mark And Ec Declaration Of Conformity

    24. CE Mark and EC Declaration of Conformity The electronic roller shutter belt winder The conformity has been verified and the corresponding superrollo GW240 / GW245 (item No.: SR10240 / declarations and documentation are available on file at SR10245) complies with the requirements of the the manufacturer’s premises.
  • Page 57: Accessories

    25. Accessories Sunlight / darkness sensor ZB30 Item no. SR70030 In addition, you can equip the superrollo GW240 / GW245 with a sunlight / darkness sensor.
  • Page 58: Warranty Conditions

    26. Warranty conditions superrollo Hausautomatisierung GmbH provides a A prerequisite for the warrant is that the new device must 24-month warranty for new systems that have been have been purchased from one of our approved specialist installed in compliance with the installation instructions.
  • Page 60 Hausautomatisierung GmbH Gewerbepark 1 01156 Dresden (Germany) www.superrollo-online.de * 30 seconds free of charge, subsequently 14 cents / minute from German fixed line networks and Service Hotline: 01807 001-655* max. 42 cents / minute from German mobile networks.

This manual is also suitable for:

Gw240

Table of Contents