LG Multi V water mini Series Installation Operation & Maintenance page 28

Table of Contents

Advertisement

REFRIGERANT PIPING DESIGN
System Engineering
Figure 20: Coiled Expansion Loops and Offsets.
L
L
R
Large Tubing U-bend (>3/4 in.)
Table 14: Radii of Coiled Expansion Loops and Developed Lengths of Expansion Offsets.
Anticipated Linear
Expansion (LE) (in)
R
1
1/2
L
2
R
1
1
L
2
R
1
1-1/2
L
2
R
1
2
L
2
R
1
2-1/2
L
2
R
1
3
L
2
R
1
3-1/2
L
2
R
1
4
L
2
R = Centerline Length of Pipe.
1
L = Centerline Minimum Radius (inches).
2
28
L
L
L
R
R
R
1/4
3/8
6
7
38
44
9
10
54
63
11
12
66
77
12
14
77
89
14
16
86
99
15
17
94
109
16
19
102
117
17
20
109
126
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
L
R
R
L
Loop
Nominal Tube Size (OD) inches
1/2
3/4
8
9
50
59
11
13
70
83
14
16
86
101
16
19
99
117
18
21
111
131
19
23
122
143
21
25
131
155
22
26
140
166
L
L
Small Tubing U-bend (<3/4 in.)
1
1-1/4
11
12
67
74
15
17
94
104
18
20
115
127
21
23
133
147
24
26
149
165
26
29
163
180
28
31
176
195
30
33
188
208
1-1/2
13
80
18
113
22
138
25
160
29
179
31
196
34
212
36
226

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arwn048ga2Arwn038ga2Arwn053ga2

Table of Contents