Download Print this page
Esco CelCulture User Manual

Esco CelCulture User Manual

Co2 incubator

Advertisement

Quick Links

CelCulture CO
CelCulture Control System
DECON Button & DECON LED
 To activate 90oC moist heat decontamination procedure
 During decontamination procedure, the yellow DECON LED will light up
MENU Button
 When the main LCD shows normal display – MENU button will activate the
menu options
 Within the menu display – MENU button will bring up the previous menu level
SET Button
Within the menu display – SET button will confirm a selection or value
UP/DOWN Buttons
Within the menu display – UP and DOWN buttons will scroll the display up and
down
 When an input is required – UP and DOWN buttons will increase and decrease
a value
MUTE Button & ALARM LED
MUTE button will mute the audible alarm for a period of time
The red ALARM LED will light up whenever an alarm condition is triggered
CTN
L
E
ABORATÓRIO DE
NSAIOS
L
IMPAS
E
N
10, 2695-066 B
STRADA
ACIONAL
Incubator ESCO
2
CCL-170B-8
1
T
Á
ECNOLÓGICOS EM
REAS
OBADELA
Edição: 01
Revisão: 00
Data: 2014
HM

Advertisement

loading
Need help?

Need help?

Do you have a question about the CelCulture and is the answer not in the manual?

Questions and answers

Summary of Contents for Esco CelCulture

  • Page 1 ACIONAL OBADELA CelCulture CO Incubator ESCO CCL-170B-8 CelCulture Control System DECON Button & DECON LED  To activate 90oC moist heat decontamination procedure  During decontamination procedure, the yellow DECON LED will light up MENU Button  When the main LCD shows normal display – MENU button will activate the menu options ...
  • Page 2 Edição: 01 Á ABORATÓRIO DE NSAIOS ECNOLÓGICOS EM REAS IMPAS Revisão: 00 Data: 2014 10, 2695-066 B STRADA ACIONAL OBADELA HEAT LED  HEAT LED will light up whenever a heating process is activated INJECT LED  INJECT LED will light up whenever a gas injection process is activated oC/%RH Display ...
  • Page 3 Edição: 01 Á ABORATÓRIO DE NSAIOS ECNOLÓGICOS EM REAS IMPAS Revisão: 00 Data: 2014 10, 2695-066 B STRADA ACIONAL OBADELA voltmeter. If voltage is not within +/-2% of the socket voltage, replace the power cord. Check the fuse of the power cord. CO2 level is below or above CO2 set-point Possible Cause Corrective Actions...
  • Page 4 Edição: 01 Á ABORATÓRIO DE NSAIOS ECNOLÓGICOS EM REAS IMPAS Revisão: 00 Data: 2014 10, 2695-066 B STRADA ACIONAL OBADELA Inner door opened for an extended period of Close the door and let the unit stabilize. time Access port stopper at the rear of cabinet Ensure access port stopper and filter are was removed or not install installed.
  • Page 5: Cleaning Procedure

    Edição: 01 Á ABORATÓRIO DE NSAIOS ECNOLÓGICOS EM REAS IMPAS Revisão: 00 Data: 2014 10, 2695-066 B STRADA ACIONAL OBADELA Air leakage through Inner door gasket. Check installation of the gasket ensure it is properly secure to the cabinet and that there is no gap.
  • Page 6 5. Re-assemble the unit by reversing s Decontamination Decontamination in CelCulture uses 90°C moist heat to kill common organisms that contaminates workspace including all installed components. The entire program run of the decontamination routine takes approximately 15 hours (overnight process. The chamber is clean...

This manual is also suitable for:

Ccl-170b-8