PERCo CL-05.2 Operation Manual

Lock controller
Table of Contents

Advertisement

Quick Links

Lock Controller
CL-05.2
OPERATION MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CL-05.2 and is the answer not in the manual?

Questions and answers

Summary of Contents for PERCo CL-05.2

  • Page 1 Lock Controller CL-05.2 OPERATION MANUAL...
  • Page 2 Lock Controller CL-05.2 Operation Manual...
  • Page 3: Table Of Contents

    CONTENTS APPLICATION......................3     OPERATION CONDITIONS..................3     TECHNICAL SPECIFICATIONS .................4     DELIVERY SET......................5     Standard delivery set.....................5     Additional equipment supplied upon request:............5     PRODUCT DESCRIPTION ..................6     Design and operation ....................6     Signal parameters of OD control output ..............6  ...
  • Page 4: Application

    Controller can be used as a standalone unit or as a part of PERCo-Web access control system. Controller management and configuration can be performed through built-in web- interface or PERCo-Web network Software.
  • Page 5: Technical Specifications

    Operation Manual 3 TECHNICAL SPECIFICATIONS Rated operating voltage..................12±1.2VDC Consumption current ..................max 0.15 A Power consumption ....................max 2 W Number of controlled entrance points ................1 Number of RC inputs ......................1 Proximity card types ................... HID, EM-Marine Card reading distance at the rated operating voltage for different card types: for HID cards ....................
  • Page 6: Delivery Set

    CL-05.2 Lock Controller 4 DELIVERY SET 4.1 Standard delivery set Controller ........................... 1 Metal base ......................... 1 Jumper ..........................1 Suppressor (15-18V) ......................1 Mounting kit: plastic dowels ......................4 screws ........................4 Package ..........................1 Certificate ........................... 1 Operation manual ......................1 4.2 Additional equipment supplied upon request:...
  • Page 7: Product Description

    64-bit code. Types of compatible cards: HID and EM-Marine. Controller provides connection via Ethernet (IEEE 802.3) interface with TCP/IP (ARP, IP, ICMP, TCP, UDP, DHCP) protocol stack support and PERCo-Web system communication protocol application layer support. Using electromechanical locks, opened when energized, it is possible to use two controllers for managing one two-way entrance point (supporting zone changing).
  • Page 8: Signal Parameters Of "Door" And "Du" Inputs

    CL-05.2 Lock Controller At potential OD operation mode:  During a single passage, output gets activated for the period of time, defined in Software by “Time of holding in unlocked state” parameter or until the passage completion.  Having OD set for “Open” in ACM, output gets activated until the mode is changed.
  • Page 9: Signal Parameters Of The Additional Output

    +3.3 V through resistor with 4.7 kOhm resistance. Choose additional output use variant in PERCo-Web Network Software. In order to set the output operation mode, set the value according to Table 1 in “Type” parameter of the “Additional output”...
  • Page 10: Choosing Ip-Address Setting Method

    CL-05.2 Lock Controller 5.5 Choosing IP-address setting method Controller IP-address setting method is chosen by jumper installation and removal on XP1 output on the controller back side. Output configuration is given on Fig. 1. Attention! Jumper installation and removal should be performed on de-energized equipment only.
  • Page 11: Marking And Packaging

    Operation Manual 6 MARKING AND PACKAGING Controller has a marking label located on the back side of the housing. The location of the label and other markers can be found on Fig. 1. The label features the following information about the controller: ...
  • Page 12: Installation

    CL-05.2 Lock Controller 8 INSTALLATION Observe the instructions given in Section 7.1 during controller installation. 8.1 General instructions It is recommended to install controller near OD. Controller should be installed at a place with easy access for proximity card presentation.
  • Page 13 Operation Manual 3. Mark and prepare holes on installation surface for the metal base mounting and for cabling as per scheme given on Fig. 2. 4. Loosen the screw located at the bottom side of controller housing and fixing it to the metal base.
  • Page 14 CL-05.2 Lock Controller Note: Use normally closed electromechanical locks as an OD in this configuration. Electromagnet or normally open electromechanical locks can be used only having the interposing relay installed. 16. Connect Ethernet cable, coming from controller to the local network. Use RJ45 adapter from the delivery set and cable #1 in order to make an extension (Fig.
  • Page 15 Operation Manual Figure 3. Controller connection scheme...
  • Page 16 CL-05.2 Lock Controller Figure 4. Scheme of the parallel connection of two controllers for managing double-sided door The given scheme features connection of locks, open when energized (normally closed electromechanical locks). In order to connect locks, open when de-energized (normally open electromechanical locks and electromagnet locks), install the supplementary relay with normally closed contacts connected to the lock power supply circuit.
  • Page 17: Powering

    During the first connection computer network settings change may be required. Initially all PERCo controllers feature IP-addresses from the 10th subnet, thus it is required to add IP-address to the additional parameters of computer TCP/IP: 10.x.x.x (x-random numbers) and subnet mask 255.0.0.0.
  • Page 18: Operation

    CL-05.2 Lock Controller 11 OPERATION Observe safety instructions given in Section 7.2 during controller operation. Do not!  Use abrasive or chemically active materials for cleaning external surfaces of controller housing.  Jerk and hit controller housing, lock, door sensor, RC-button and connecting cables in order to prevent their mechanical damage or deformation.
  • Page 19 Operation Manual  Presenting the access card, meeting all the passage grant criteria, to the reader. OD gets unlocked for “Time of holding in unlocked state”. “Closed” ACM – passage ban mode.  OD is blocked until ACM change.  RC-button (“Exit”) pressing is ignored. ...
  • Page 20: Indication

    CL-05.2 Lock Controller 11.2 Indication Possible variants of ACM indication, controller states and reactions to identifier presentation are given in Table 4. Indication is located on the indication module, featuring three light indicators on the controller housing front panel. Note: ...
  • Page 21: Transportation And Storage

    Operation Manual In this case it can be said that IP-packets are not fragmented to the size smaller than 576 bytes and the chosen connection should function correctly. If it is impossible to get the positive answer, this means that on the IP-packet route there is a network commutating equipment, fragmenting IP-packets up to the size smaller than 576 bytes.
  • Page 22: Maintenance

    CL-05.2 Lock Controller 13 MAINTENANCE Operation and technical staff, responsible for controller technical maintenance, is to know its design and operation rules. Follow the rules given in Section 7 “Safety requirements” of this Manual when making any works on technical maintenance.
  • Page 23: Appendix 1. Controller Connection Through Poe-Splitter

    Con 3 – power output for controller power cable connection. Note: For some models of splitters output voltage is chosen with the switcher. Operating with PERCo equipment it is necessary to turn the switcher into “12V” mode. Connection sequence Follow this sequence during controller connection through splitter: 1.
  • Page 24 CL-05.2 Lock Controller Figure 5. Controller connection scheme through PoE-splitter...
  • Page 25: Appendix 2. Controller Web-Interface. User Manual

    User Manual 2. Controller Web-interface. User Manual APPENDIX CONTENTS WEB-INTERFACE OPPORTUNITIES ..............25     CONNECTION TO WEB-INTERFACE OF THE CONTROLLER ......25     SETTING........................27     Change of network setting of the controller ............27     Setting of the access password of the controller ..........27  ...
  • Page 26: Web-Interface Opportunities

    Note: Change of configurations via Web-interface of the controller is not available if the controller is under control of network or local software of PERCo systems (you can only monitor the configuration; operations are forbidden). The access to Web- interface is allowed if the software is configured to “Allow Web-interface”. It is possible after stopping the operation of the software and stopping the server of PERCo system.
  • Page 27 User Manual On the page, you can select following: 1. The title bar if he page contains PERCo trademark and buttons to select the language of Web-interface. By clicking on the PERCo company logo you navigate to the main page from other sections of Web-interface.
  • Page 28: Setting

    CL-05.2 Web-interface 3. SETTING Change of network setting of the controller The controller has following configurations by default (they are specified in the certificate of the device and on the labels on the controller):  MAC-address 00-25-0B-xx-xx-xx, where xx – is a number from 00 to FE;...
  • Page 29: Choice Of Settings Of Memory Allocation

     30,000 cards and 550,000 events,  40,000 cards and 390,000 events. Note: In software PERCo-Web are supported all these options, but their choice is only available in the Web interface. To change Settings on the memory allocation of the controller: 1.
  • Page 30: Configuration Of The Settings Of The Controller Resources

    CL-05.2 Web-interface Configuration of the Settings of the controller resources 4.2.1 Operating devices To configure Settings of the controller resources to control OD: 1. Click consistently in the Web-interface menu: “Configuration” → “Edit” → “Operating devices”. The page with working area will be opened: 2.
  • Page 31: Physical Contacts (Inputs And Outputs)

    3) Input - output SYNC (synchronization of 2 controllers) Notes:  Input 3 or Output 2 of CL-05.2 controller are led in one leading-out wire – brown wire.  “SYNC” function (synchronizing input-output for common operation of 2 CL-05.2 controllers) for input 3 / output 2 can be set only via net software of PERCo systems (see Operating Manual, Section 5.4.3).
  • Page 32: Readers

     Change of this parameter when you have already entered the access control cards, results in the passage on these cards will be impossible.  When connecting to the controller working under software of PERCo systems, the current formant may not be shown (nothing is selected from the formats). In this case to change the reading format of card identifiers is PROHIBITED.
  • Page 33: Control Of Operating Device

    User Manual 2. To add the new response, click the “Add” button, to change the Settings of internal response or delete it, click in the working area of the page on the line with the response name. The window “Internal response (number)” will be opened: 3.
  • Page 34: Access Cards

    CL-05.2 Web-interface 2. Click in the working area of the page on the line with OD “Lock #1”. The control window with selected OD will be opened: 3. Using the buttons at the bottom part of the window, give the necessary command. The control window will be closed;...
  • Page 35: The List Of Stored Cards

    User Manual  If necessary, similarly add other cards.  In the working area of the page click the “Switch off card reader input” button. 4. Entering of the card identifiers manually:  In the working area of the page click the “Manual input” button. The window “Card input”...
  • Page 36 CL-05.2 Web-interface 2. If necessary, use the dropdown list in the heading of the “Number” column, select the format to display the cards identifiers. Note: The display format is not the format of reading of the card identifiers (set in the “Configuration”...
  • Page 37: Loading The Identifiers From A File

    Attention! Setting of Settings of time access criteria via the controller is possible only in network software of PERCo systems. In the Web-interface is only possible to change the time criterion (time zone, weekly schedule, flexible daily schedule, flexible weekly schedule) and transition from one set of time Settings to another set by changing his number.
  • Page 38: Events

    CL-05.2 Web-interface 7. EVENTS To view the event log of the registration of the controller: 1. Click in the Web-interface menu: “Events”. The page with working area will be opened: 2. By default, all events stored in the controller memory are displayed, by 20 events on the page.
  • Page 39: Status

    User Manual 8. STATUS To view the controller status and status of all his resources click in the Web-interface menu “Status”. The page with working area will be opened: 9. DIAGNOSTICS For diagnostics and maintenance of the controller: Click in the Web-interface menu: “Diagnostic”. The page with working area will be opened: 2.
  • Page 41 PERCo Polytechnicheskaya str., 4, block 2 194021, Saint Petersburg Russia Tel: +7 812 247 04 64 E-mail: export@perco.com support@perco.com www.perco.com...
  • Page 42 www.perco.com...

Table of Contents