Download Print this page

Handle Installation; Drain Assembly; Component Parts - JACLO CUBIX Installation Instructions Manual

Widespread faucet

Advertisement

Handle Installation

1.
Install handle onto stem in desired "off"
position.
2.
Confirm handle is not binding with
escutcheon. Adjust valve nuts and
escutcheon if necessary.
3.
Handles are fastened with a set screw or
top screw. Figure 6.
4.
If set screw type, install washer and
screw, tighten then press in decorative
cap with o-ring.
5.
If top screw type, install washer and
screw, tighten then press in decorative
cap with o-ring.

Drain Assembly

COMPONENT PARTS

1.
Disassemble top flange (2) and drain stopper (1)
from pop-up drain body (6).
2.
Loosen mounting nut (5) for desired height.
*Note: This may vary depending on thickness of
sink basin or countertop.*
3.
Apply appropiate silicon/putty under lip of top
flange (2).
4.
From underneath, insert drain body (6) through
sink basin or countertop and attach top flange (2).
5.
Guide sink gasket (3) & plastic washer (4) up snug
to bottom of sink basin or countertop.
6.
Test the length needed for drain stopper (1) by
adjusting height of eyelet so it is visible from side
port of ball rod.
7.
Align top flange (2) & drain body (6) & tighten nut
(5) securely.
8.
Test alignment using ball rod (10) without ball rod
seats (8) to ensure it goes through eyelet of drain
stopper (1).
COMPONENT PARTS
9.
Adjust length of drain stopper (1) (if required) by
Aerator - CU-400-AER
loosening the nut & eyelet to desired height. Then
Spout - CU-400-SPOUT-LL-**
secure back up to bottom of drain stopper (1).
Pop Up Rod Assembly - CU-400-R-*** / CU-400-K-***
10. Put one ball rod seat (8) before ball in ball rod (10)
Handle (2) - VARIES ON MODEL
concave side toward ball. Push through side port
making sure the ball rod (10) goes through drain
Valve Escutcheon (2) - CU-400-ESC-***
stopper (1) eyelet. Put second seat (8) on+to other
Valve Body Hot - 11832-0
side of ball rod (10) & attach ball rod nut (9). Do
Valve Body Cold - 11833-0
not over tighten.
Valve Body Nut (2)
11. Pushing ball rod (10) down to raise drain stopper
(1) in sink. Test & adjust if necessary.
Cock Nut - A438-0
12. Attach lift rod strap (11) to pop-up rod.
Hose (2) - 5130-RGH
13. Push down on ball rod (10) putting one
Washer - CU-400-WASHER-0
end of spring clip (12) on, then put through
Brass Nut - CU-400-NUT-0
appropiate hole in lift rod strap (11). Attach other
end of spring clip (12) & test.
Brass Nipple - 0-CU-400-LL-NIPPLE
14. Attach tailpiece (7) to drain body (6) using pipe
Brass Tee - CU-400-TEE-0
thread sealing tape on threads.
Spout Base - CU-400-SPTB-***
Spout Base Extension - CU-400-SPTB-EXT-***
Spout Plate - CU-400-PL-***
REVISED 3.30.18
JACLO.COM
| PG 4
A
5
6
7
FIGURE 6
1
9/16"
2
11
12
3
13
5
8
6
14
7
5
j a c l o i n d u s t r i e s | 129 Dermody Street Cranford, NJ 07016
p 908.653.4433 | 800.852.3906
3
1 ½"Ø
4
8
9
COMPONENT PARTS
6
8
9
f 908.653.1717 | 800.852.4133
13
11
12
10
17
1
11
2
3
5
6
10
7

Advertisement

loading

This manual is also suitable for:

33043204