Advertisement

Apricus Solar Hot Water
Installation Manual
For Electric Hot Water Tanks (Solar-Ready)
Issue Date: 01.06.16
Review Date: 01.06.16
H0024 028626 A
Installation Manual for EHW Tanks: MAN_INST_TANK_SRT(AA)|1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AP250GLE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Apricus AP250GLE

  • Page 1 Apricus Solar Hot Water Installation Manual For Electric Hot Water Tanks (Solar-Ready) Issue Date: 01.06.16 Review Date: 01.06.16 H0024 028626 A Installation Manual for EHW Tanks: MAN_INST_TANK_SRT(AA)|1...
  • Page 2: Table Of Contents

    CONTENTS CHAPTER 1: INTRODUCTION ............................... 3 CHAPTER 2: WARNINGS AND PRECAUTIONS ........................4 CHAPTER 3: SITE INSPECTION.............................. 6 CHAPTER 4: COMPONENT INSPECTION ..........................7 CHAPTER 5: SYSTEM PLUMBING ............................8 CHAPTER 6: COMMISSIONING ............................11 CHAPTER 7: AUXILIARY HEATING ............................12 CHAPTER 8: POST INSTALLATION ............................
  • Page 3: Chapter 1: Introduction

    Boost: The process where a heating component (such as an electric element) is used to provide auxiliary heating/  Collector: The Apricus solar collector includes the manifold with heat pipes and evacuated tubes inserted.  Expansion Control Valve (ECV): Installed on the cold mains line to relieve excess pressure.
  • Page 4: Chapter 2: Warnings And Precautions

    Apricus recommends the use of an ECV on every installation.  AS/NZS 3500.4 - National Plumbing and Drainage Code ...
  • Page 5 2.4.2 LEGIONELLA CONTROL Legionella bacteria can be found naturally in the environment and thrives in warm water and damp places. It can weaken the body’s immune system, which can increase the chances of developing Legionnaires’ disease. To ensure legionella growth is inhibited, the boosting regime must meet the guidelines as shown in Chapter 8: Auxiliary Heating.
  • Page 6: Chapter 3: Site Inspection

     All tanks must be transported upright. Stacking is not CHAPTER 3: SITE INSPECTION recommended for any tanks.  Products should always be handled with care. Damage incurred during the transportation is not 3.1 STORAGE TANK LOCATION covered under product warranty. ...
  • Page 7: Chapter 4: Component Inspection

    INSPECTION 4.1 COMPONENTS PROVIDED BY APRICUS Upon receiving the system prior to installation, check that the following components have been provided. Any concerns must be brought to the attention of Apricus immediately. 4.1.1 STORAGE TANK AND PTRV  Ensure the tank is accompanied by an appropriate PTRV.
  • Page 8: Chapter 5: System Plumbing

    Stores hot water for when you 5.3.1 STORAGE TANK PORTS need it PTRV Pressure Temperature Relief Apricus tanks are hot water storage tanks that contain Valve seven ports. Electric Provides a backup energy source 1. Inlet (Mains): Inlet line from mains water supply Element for cloudy days and legionella 2.
  • Page 9 When solar domestic hot water system is set up, this port is used for the water line directed up to the solar All ports on an Apricus Australia storage tank are of collectors to be heated. This line consists of the following 20mm (3/4”) BSP.
  • Page 10 Apricus recommends using a three way ball valve and drain on the solar return line to allow convenient system filling and draining.
  • Page 11: Chapter 6: Commissioning

    IMPORTANT For system filling and air purge procedure as a solar DHW system, please refer to the Apricus Domestic Solar Hot Water System Installation Manual. Issue Date: 01.06.16 Review Date: 01.06.16...
  • Page 12: Chapter 7: Auxiliary Heating

    This heating can take as long as 3-4 hours if the CHAPTER 7: AUXILIARY HEATING tank is cold. Note: Apricus recommends that the electric booster is 7.1 WATER HEATING REQUIREMENTS left on, or controlled by a suitable timer. It is a legal requirement that water be heated on a regular basis to kill Legionella bacteria that can lead to 7.2.3 WATER CONNECTION...
  • Page 13: Chapter 8: Post Installation

    CHAPTER 8: POST INSTALLATION To ensure optimal operation and to maintain the integrity of the Apricus EHW tank, ensure that each of the following processes is carried out prior to leaving the site. CHECKLIST PRIOR LEAVING INSTALLATION SITE  EHW tank check: Check all connections for leaks and that all components are installed as per this manual.
  • Page 14: Chapter 9: Appendix

    CHAPTER 9: APPENDIX Figure 4 Typical Electric boosted solar hot water system Issue Date: 01.06.16 Review Date: 01.06.16 H0024 028626 A Installation Manual for EHW Tanks: MAN_INST_TANK_SRT(AA)|14...
  • Page 15: Chapter 10: Warranty

    Unit addition to the guarantees and other rights and remedies will only be met by Apricus Australia where the damage available to you under the Australian Consumer Law could be considered reasonably foreseeable and installed (“ACL”).
  • Page 16 Warranty claims can be placed by completing the Website: www.apricus.com.au following steps: Contact Apricus Australia on 1300 277 428 and speak to our Warranty and Aftersales Department.  Provide the serial number and model number of the HWS located on the white compliance sticker.

This manual is also suitable for:

Ap315gleAp400gle

Table of Contents