Download Print this page

SARAD Net Monitors Manual page 3

Advertisement

SARAD
GmbH
connected to an endpoint which has been used for another instrument before, the endpoint
must be powered off/on again to provide the correct instrument ID.
Both adapters are equipped with a short antenna to ensure a non-directed (ball like) link
range. This allows the endpoints to be located around the coordinator without respect to the
position. To increase the link power it is possible to connect a directed antenna to the
sockets of the adapters for example in case of stationary use.
Installation of the coordinator
A Windows device driver for the coordinator must be installed before the unit can be used.
The driver is just available if SARAD instruments with USB interface are already used with
this PC. Otherwise use the CD to install the drivers correctly. Attention, the installation
procedure will run two times, once for the USB and a second one for the VCP (virtual com
port).
Software integration
All actual version of SARAD software are already prepared for the Net Monitors network
operation. As soon as an action with instrument access is carried out (e.g. instrument setup),
a list with all available instruments appears at the screen. A simple click at the desired
instrument directs this action to this device.
Technical Data
Link frequency
Maximum link power
Transfer protocol
Antenna connector
Power consumption
Standby outside coordinator link range
Standby within coordinator link range
Transmitting / Receiving
Battery
Dimensions
Coordinator
Endpoint
Manual_NETmonitors_EN_31-07-12
NETmonitors
2.4 GHz
100 mW
IEEE802.15.4, ZigBee
SMA
100 µA
1 mA
40 mA
2 x AA (1.5 or 1.2 Volts)
approx. 100 x 60 x 25 mm
approx. 115 x 70 x 28 mm

Advertisement

loading