VacPak-It VMC10DPU Manual page 7

Chamber vacuum packaging machine. single 10 1/4 inch seal bar oil pump. single 10 1/4 inch seal bar dry pump. single 16 inch seal bar oil pump. double 16 inch seal bars oil pump
Table of Contents

Advertisement

Adding Oil
1. Remove the round cover on side panel by unscrewing the 4 screws.
2. Remove the oil fill bolt located on the vacuum pump using a thumbscrew cap.
3. Fill the pump with oil until it reaches the white line marked on the bottle.
4. Replace the oil fill bolt on the vacuum pump, and then replace the back
panel of the unit.
Initial Setup
1. Attach the power cord to the unit and plug the cord into a grounded electrical outlet.
2. Release the lid lock, located on the right side of the machine, and allow
the lid to lift and remain open.
NOTE: DO NOT use the machine with the lid lock engaged.
Always release the lid lock before use. The lid lock feature is only
to be used when the machine is in storage, never while in use.
3. Locate the red dial on the left side of the machine. Turn the power on by rotating the
dial towards the front of the machine, from the "0" to the "1" position.
The LED screen on the control panel will illuminate, confirming the machine is on.
Adjusting Timing Controls
Note: All adjustments and changes to this unit's timing must be made with the lid lock
disengaged and the lid open. DO NOT use the machine with the lid lock engaged.
1. To set and adjust the timing controls, press the "Set" button on the front control panel.
You can repress the "Set" button to cycle through the settings for Vacuum, Sealing,
or Cooling. Once selected, the current time setting will appear on the LED Screen.
The unit's standard settings are:
Vacuum Time – 40 Seconds
Sealing Time – 1.2 Seconds
Cooling Time – 2 Seconds
2. Once the setting is selected, you can increase or decrease the time by pressing
the "Up" or "Down" arrow buttons accordingly. The new time settings will appear on
the screen and be saved to the machine.
Note: For setting the Vacuum time, you can use filler plates to occupy space in the
chamber, leaving less air to be removed from the chamber, thus decreasing the overall
vacuuming time.
Note: For setting the Sealing time, it is recommended you increase
the seal time by small increments of 0.1 to avoid over-sealing or melting the bag.
3. Upon finishing setting the timing controls, press the "Set" button until no lights on the
control panel are illuminated. The machine will not operate until all lights are off.
7.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents