Installation; Notice Before Installation - BandLuxe E600 Series User Manual

Lte advanced outdoor cpe
Table of Contents

Advertisement

Installation

Notice before installation

Install the SIM card
1. Unscrew the SIM card slot.
2. Insert a valid SIM card into the SIM card slot. Push it until it clicks in
place.
3. Screw the cap on tightly.
Choose a solid and safe pole for CPE installation
1. Choose the best location of the house and the orientation of the CPE
to get the strongest signal reception from base station.
2. The ambient temperature for E600 series must be within -40°C to
65°C (-40°F to 149°F).
NOTE
For lightning protection ground the CPE via Grounding Terminal and optimum
reception, there are a few things you should consider before installation. Please
see "Important Installation Considerations" on page 8 for more details.
Prepare two Ethernet cables
Be sure that one of the cables used is an outdoor grade CAT 5e (or above)
Ethernet cable type and the length of the cables are adequate to reach
the location of the CPE and indoor PPoE are.
Prepare wrenches
Prepare one wrench. The wrench size: 17mm x 1.
Warning:
Do NOT start any traffic test (ex: throughput test and Internet browsing)
before the installer returns to the ground.
7
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents