Vertiv Alber Cellcorder CRT-400 Operating Instructions Manual
Vertiv Alber Cellcorder CRT-400 Operating Instructions Manual

Vertiv Alber Cellcorder CRT-400 Operating Instructions Manual

Cell resistance tester
Hide thumbs Also See for Alber Cellcorder CRT-400:

Advertisement

Quick Links

C R T- 4 0 0 C e l l R e s i s t a n c e T e s t e r
Quick Start Instructions
Operating Instructions
Vertiv Corporation
1050 Dearborn Drive,
Columbus, OH 43065 USA
Telephone: (954) 337-7101
Fax: (954) 377-7042
Email: alber-service@vertivco.com
©2018 Vertiv Corporation
590-2093-501A /SL-29408/4200-049 R3

Powering On the Cellcorder

1.
Press and release the green Power Key.
P o w e r
2.
The firmware version number appears.
3.
If readings are in temporary storage, messages
appear.
4.
To save readings, insert the USB flash drive
and press Yes/F1. Whether you select Yes or
No/F2, readings stay in memory.
5.
To clear readings from the memory, press
Yes/F1. Do this if you are starting a new set
of readings.
6.
To keep readings in memory, press No/F2. Do
this if you are not finished taking readings or
want to examine the readings.
7.
The Main Menu appears.
Note: It is highly recommended that the calibration
constants are saved to the USB flash drive.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Alber Cellcorder CRT-400 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Vertiv Alber Cellcorder CRT-400

  • Page 1 The Main Menu appears. Vertiv Corporation 1050 Dearborn Drive, Columbus, OH 43065 USA Telephone: (954) 337-7101 Fax: (954) 377-7042 Email: alber-service@vertivco.com Note: It is highly recommended that the calibration constants are saved to the USB flash drive. ©2018 Vertiv Corporation 590-2093-501A /SL-29408/4200-049 R3...
  • Page 2 Powering Off the Cellcorder Press and hold the green Power Key. Powering off doesn’t automatically delete voltage or resistance readings from memory. P o w e r If readings are in memory, you are prompted to save them. Taking Voltage Readings Connect the voltage probes to the Cellcorder Warning and select Test Mode/F1.
  • Page 3 ™ C R T - 4 0 0 C e l l R e s i s t a n c e T e s t e r The Cellcorder is also a Digital Voltmeter (DVM) In the voltage mode, select DVM by pressing The screen displays the measured voltages.
  • Page 4 Connecting the Resistance Leads These figures show connections These figures show connections for triple post cells. for dual post cells. Take two readings. Take three readings. Read with the intercell leads connected Read with the intercell leads connected from terminal posts A to C. from terminal posts A to D.
  • Page 5 Transferring Specific Gravity Saving the Readings and Temperature Readings On the CRT-400, select a cell data file to Saving New Data Readings to the transfer Specific Gravity and Temperature USB Flash Drive readings into. This can be readings that already exist in memory or you can open a previously saved set of readings from the USB flash drive.
  • Page 6 Select F2 once again to confirm the Backup. owned by Bluetooth SIG, Inc and any use of such marks by Vertiv is under license. Other trademarks and trade names are those of their Enter a File Name and select F2 to so Save.

Table of Contents