- INSTRUCTIONS - 4. Remove and save lower shock hardware. SEE FIGURE 3 FRONT SUSPENSION 1. Disconnect the negative terminal on the battery. Jack up the front end of the truck and support the frame rails with jack stands. NEVER WORK UNDER AN UNSUPPORTED VEHICLE! Remove the front tires.
Page 4
FIGURE 9 - STEP 10 to the factory spring perch using the supplied 8mm hardware. Using the 5/16 hardware attach the factory brake line bracket to the new Fabtech bracket. SEE FOR 2011-UP MODEL TRUCKS, SKIP TO STEP 12 FIGURE 7 11.
Page 5
18. Install Driver Warning Decal. Complete product registration card and mail to Fabtech in order to receive future safety and technical bulletins on this suspension. Vehicles that will receive oversized tires should check ball joints, uniballs and all steering components every 2500-5000 miles for wear and replace as required.