Sanyo C2462R Technical Data & Service Manual page 43

Split system air conditioner
Hide thumbs Also See for C2462R:
Table of Contents

Advertisement

12. SERVICE PROCEDURES
F.
Check. auxiliary relay. (1Y or 2Y)
• Check coil resistance of
auxiliary relay.
G. Check fuse on the P.C.B. Ass'y in the indoor unit.
• Check fuse on the P.C.B.
Ass'y in the indoor unit
for continuity.
• Check resistance of
primary and secondary
winding of transformer.
• Check resistance of indoor
fan motor winding.
(1Y or 2Y)
0620_X_S
When the fuse blows.
OK
OK
– 43 –
• Check coil of compressor
motor magnetic contactor.
(52C)
OK
• P.C.B. Ass'y is defective.
2219_X_S
SM830092

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cl2462rKs2462r

Table of Contents