Table 6.2.2 List of initialization when changing setup value (Measured data and operating data)
Setup items
Electric energy(consumption)
Regenerate electric energy
Reactive electric energy
Periodic electric energy
Electiric energy convertion
Electiric energy convertion (3phase)
Pulse count
Pulse convertion
Operating time
Electric energy (consumption) (3phase)
Regenerate electric energy (3phase)
Periodic electric energy (3phase)
CO2 convertion
Operating time (3phase)
Line voltage (all phases)
○ ○ ○ ○ ○ ○ ○
Line voltage (1-2)
○ ○ ○ ○ ○ ○ ○
Line voltage (2-3)
○ ○ ○ ○ ○ ○ ○
Phase voltage (All phases)
○ ○ ○ ○ ○ ○ ○
Powr factor (All phases)
○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Powr factor (1phase)
○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Powr factor (3phase)
○ ○ ○ ○ ○ ○ ○
Demand current (All phases)
○
○
Demand current (1 phase)
○
○
Demand current (3 phase)
○
○
Demand electric power (All phases)
○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Demand electric power (1 phase)
○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Demand electric power (3 phase)
○ ○ ○ ○ ○ ○ ○
Current unbalance rate
○
○
Voltage unbalance rate
○ ○ ○ ○ ○ ○ ○
Line voltage (all phases)
○ ○ ○ ○ ○ ○ ○
Line voltage (1-2)
○ ○ ○ ○ ○ ○ ○
Line voltage (2-3)
○ ○ ○ ○ ○ ○ ○
Phase voltage
○ ○ ○ ○ ○ ○ ○
Powr factor (All phases)
○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Powr factor (1phase)
○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Powr factor (3phase)
○ ○ ○ ○ ○ ○ ○
Demand current (All phases)
○
○
Demand current (1 phase)
○
○
Demand current (3 phase)
○
○
Demand electric power (All phases)
○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Demand electric power (1 phase)
○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Demand electric power (3 phase)
○ ○ ○ ○ ○ ○ ○
Mark
○
■
○ ○ ○
○ ○ ○
○
○ ○ ○
○
○ ○ ○
○
○ ○ ○ ○
○ ○ ○
○ ○ ○
○ ○ ○
○
○ ○ ○
○
○ ○ ○
○
○ ○ ○ ○
Contents
Initialize.
Initialize (Not initialize in 1P2W).
Setup value to be changed
○
○
○
○