Service Re-Commissioning - BENSON 30 Installation And Operating Manual

Gas fired cabinet heaters
Table of Contents

Advertisement

4.2.11 Report
A full and detailed service report should be prepared, it is
advised that the report is not completed until the heater has
been re-commissioned, where upon the completed report
can then be run through with the user.
4.3

Service Re-commissioning

The heater should be re-commissioned as follows, as per
section 3.1 through to section 3.4 inclusive.
This must be regarded as a necessary part of the heater
service. By the service engineer.
Turbulator Positions in Heat Exchanger
Model 60 Cabinets. 11 off
Turbulator Positions in Heat Exchanger
Models 120 & 135 Cabinets. 18 off
Turbulator Positions in Heat Exchanger
Models 235 & 300 Cabinets. 40 off
Doc No. 20-45-159 Page 50 of 60
Turbulator Positions in Heat Exchanger
Model 85 Cabinets. 22 off
Turbulator Positions in Heat Exchanger
Models 180 & 205 Cabinets. 40 off
Turbulator Positions in Heat Exchanger
Model 375 Cabinets. 28 off

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6040120135180205 ... Show all

Table of Contents