Use extreme care when testing the system. Line voltage is
present on most terminal connections when power is on.
Ensure proper selection of configuration jumpers before
starting the burner operation.
CAUTION
Electrical Hazard.
Can cause equipment damage.
Do not perform a dielectric test with the relay module
installed. Internal surge protectors break down and
conduct a current. This can cause the relay module to
fail the dielectric test or destroy the internal lightning
and high current protection.
1. Open the master switch before installing or removing a
jumper on the subbase.
2. Before continuing to the next test, be sure to remove
test jumper(s) used in the previous test.
3. Replace all limits and interlocks that are not operating
properly. Do not bypass limits and interlocks .
Equipment Recommended
Voltmeter (1M ohm/volt minimum sensitivity) set on the 0 to
300 Vac scale and two jumper wires, No. 14 wire, insulated,
12 in. (304.8 mm) long with insulated alligator clips at both
ends.
Test No.
Test Jumpers
1
None
2
None
3
5-16
NOTE: Disconnect horn at this time (if used).
4
5-16
5
5-16
6
5-16
5-4
NOTE: Remove jumpers and reconnect alarm (if used).
7
5-10
8
5-8
EC7830, RM7830A,EC7850A,RM7850A 7800 SERIES RELAY MODULES
Table 4. EC/RM7830A Static Checkout.
Voltmeter
Normal Operation
5-L2
Line voltage at terminal 5.
17-L2
Line voltage at terminal 17.
Alarm (if used) turns on.
2-20
Line voltage at terminal 20.
2-6
Line voltage at terminal 6.
1.
Fan (Burner Motor or Blower)
2-7
starts.
2.
Line voltage at terminal 7.
Ignition spark (if ignition
transformer is connected to
terminal 10).
1.
Ignition spark (if ignition
transformer is connected to
terminal 8).
2.
Automatic pilot valve opens (if
connected to terminal 8).
NOTE: Refer to wiring diagram of
system being tested.

General Instructions

1. Perform all applicable tests listed in the Static
Checkout, Table 4 or 5, in the order listed.
2. Make sure all manual fuel shutoff valves are closed.
3. For each test, open the master switch and install the
jumper wire(s) between the subbase wiring terminals
listed in the Test Jumpers column.
4. Close the master switch before observing operation.
5. Read the voltage between the subbase wiring terminals
listed in the Voltmeter column.
6. If there is no voltage or the operation is abnormal,
check the circuits and external devices as described in
the last column.
7. Check all wiring for correct connections, tight terminal
screws, correct wire, and proper wiring techniques.
8. Replace all damaged or incorrectly sized wires.
9. Replace faulty controllers, limits, interlocks, actuators,
valves, transformers, motors and other devices, as
required.
10. Make sure normal operation is obtained for each
required test before continuing the checkout.
11. After completing each test, be sure to open the master
switch and remove the test jumper(s).
1.
2.
3.
Preignition interlocks.
Alarm.
Limits in Lockout Circuit.
1.
2.
1.
2.
1.
1.
2.
11
If Operation is Abnormal ,
Check the Items Listed Below
Master switch.
Power connected to the master
switch.
Overload protection (fuse, circuit
breaker, etc.) opened the power
line.
Recycle limits.
Burner control.
Fan circuit.
a.
Manual fan switch.
b.
Fan power supply,
overload protection and
starter.
c.
Fan.
Running Limits or Airflow Switch
(LD2 input).
Watch for spark or listen for buzz.
a.
Ignition electrodes are clean.
b.
Ignition transformer is okay.
Watch for spark or listen for buzz.
a.
Ignition electrodes are clean.
b.
Ignition transformer is okay.
Listen for click or feel head of
valve for activation.
a.
Actuator if used.
b.
Pilot valve.
(continued)
66-1092—2