Power Cable Of Battery; Installation Of Battery - Upsen ES33 Series User Manual

Online hf ups10-120kva (380/400/415vac)
Table of Contents

Advertisement

3Phase HF UPS 10-120kva USER Manual
Diagram 17-1: Battery connection
(2)For long back up time model with external battery -----Battery quantity from
+/-14-20PCS settable on LCD screen
Please refer the Diagram 17-2: Battery connection as below:
Diagram 17-2: Battery connection

3.4 Power cable of battery

3.4.1 Installation of battery

1.Generally, the space between the vertical surface and the sides shall be at 1~10 mm,
Page16

Advertisement

Table of Contents
loading

Table of Contents