Download Print this page

Diamondback 270 Installation Manual

Nissans without utili-tracks

Advertisement

Quick Links

DiamondBackCovers.com / 800 935 4002
INSTALLATION GUIDE
75 minutes
Normal install time
PARTS INCLUDED:
PARTS INCLUDED:
Cab & T Panels Assembly
Tail Panel
PRE-INSTALLATION NOTES:
You should mount the included bulkhead prep kit prior to installing
the cover. Refer to the Bulkhead Prep Kit Installation Guide for details.
MOUNT THE COVER
Place the cab & T panels
1
assembly on the front half
of the bed so its leading
edge lines up with the
outside edge of the
bulkhead.
Loosely affix the T panel to the
2
truck by finger-tightening two
cap clamps under both side
ends of the T panel.
Attach the tail panel by angling it 90° from the bed rails, sliding its
3
driver-side, loop-shaped hinge knuckle fully onto the correspond-
ing center-panel hinge pin, then dropping its passenger-side,
C-shaped hinge knuckle fully onto its corresponding pin.
FIRST
Lower the tail panel into the
4
closed position.
Keep an eye out for these icons:
Bed-Rail
Edge Trim (2)
1/8" Hex
Key
90°
Nissans Without Utili-Tracks
IMPORTANT!
Important installation information
Cap Clamps (6)
Gas Springs (6)
If you are also installing a Cross Bin, do so now. Refer to page 2 of
v Cross Bin Installation Guide for details.
Center the cover side to side.
5
Confirm the leading edge of the cover still lines up with the outside
6
edge of the bulkhead.
Place the two remaining cap clamps under
7
the nose of the T panel, their bottom
jaws gripping the underside of the
SECOND
Tighten all six cap clamps with a 9/16" socket.
8
Road vibration can loosen your clamps. Retighten them after
100 miles. Check them every time you haul on top.
270
Helpful Hints
Tips to assist installation
TOOLS REQUIRED:
TOOLS REQUIRED:
9/16"
Ratchet Wrench
Socket
7/16"
Utility Knife
Socket
CONTINUED ON REVERSE >
CVR-270.6

Advertisement

loading

Summary of Contents for Diamondback 270

  • Page 1 Nissans Without Utili-Tracks DiamondBackCovers.com / 800 935 4002 INSTALLATION GUIDE CVR-270.6 75 minutes IMPORTANT! Helpful Hints Keep an eye out for these icons: Normal install time Important installation information Tips to assist installation PARTS INCLUDED: TOOLS REQUIRED: PARTS INCLUDED: TOOLS REQUIRED: Bed-Rail 9/16"...
  • Page 2 SET THE LOCK RODS If plastic extends Position the lock rods tight beyond the bottom of against the underside of the vertical face of the the bed rails so that they’ll 7/16" socket truck’s metal bed rails, draw the panels down and trim a two-inch length of it to compress the weather- flush with the bed rail’s...