Eclipse PulsePak Installation Manual

Valve train segments nfpa and ce models

Advertisement

Quick Links

791-2 Installation Guide
8/10/2010
Eclipse PulsePak
Valve Train Segments
NFPA and CE Models
Version 1
Gas
2-1/2" - 3"
Valve
Air Valve Train
Train

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PulsePak and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eclipse PulsePak

  • Page 1 791-2 Installation Guide 8/10/2010 Eclipse PulsePak Valve Train Segments NFPA and CE Models Version 1 2-1/2" - 3" Valve Air Valve Train Train...
  • Page 2 Please send your corrections and comments to our Marketing Communications Manager. It must be understood that Eclipse’s liability for its product, whether due to breach of warranty, negligence, strict liability, or otherwise is limited to the furnishing of replacement parts and Eclipse will not be liable for any This is the safety alert symbol.
  • Page 3: Table Of Contents

    Leakage Rate Limits......................10 5 Maintenance & Troubleshooting..................11 Introduction .......................... 11 Maintenance......................... 11 Monthly Checklist ......................... 11 Yearly Checklist........................11 Troubleshooting Guide ......................11 Appendix ........................... i Conversion Factors ......................i Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 4: Introduction

    Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 5: Purpose

    This manual provides information for the use of these valve trains for their specific design purpose. Do not deviate from any instructions or application limits in this manual without written advice from Eclipse. Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 6: Installation

    • European: EN 746-2 with CE mark from TuV, 333 Pfingsten Road Gastec, Advantica Northbrook, IL 60062 www.ul.com The FM Standards are available from: 1151 Boston-Providence Turnpike PO Box 9102 Norwood, MA 02062 www.fmglobal.com/approvals Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 7: Checklist Before Installation

    Avoid severe size reductions in pipe connections, unnecessary fittings, and excessive numerous bends that may cause additional flow restriction and pressure loss. Outlet Figure 3.3 Air Valve Train with Piped Bypass Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 8: Checklist After Installation

    • Access covers are in place and tightened • Verify all device orientations are correct with respect to flow direction • Ensure that it is in accordance with the equipment system design Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 9: Adjustment, Start, And Stop

    If there is a pressure rise, the valve must be serviced; see the following chart for guidelines. Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 10: Leakage Rate Limits

    30 seconds to charge the Leakage Rate Limits UL 429, ANSI Z21.21, NPT (in) DN (mm) CSA6.5 Bubbles/min FM7400 Bubbles/min EN161 Bubbles/min 0.50 0.75 1.00 1.50 2.00 2.50 3.00 4.00 6.00 8.00 Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 11: Maintenance & Troubleshooting

    Check burner firing rates, compare to datasheets Gas valves not closing Leaking seat Perform seat leak test, service valve Control wiring short Remove wiring to valve terminals and service control system Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 12 NOTES Eclipse PulsePak Valve Train Segments, V1, Installation Guide 791-2, 8/10/2010...
  • Page 13: Appendix

    Appendix Conversion Factors Metric to English From Multiply By cubic meter (m³) cubic foot (ft³) 35.31 cubic meter/hr (m³/h) cubic foot/hr (cfh) 35.31 degrees Celsius (°C) degrees Fahrenheit (°F) (°C x 9/5) + 32 kilogram (kg) pound (lb) 2.205 kilowatt (kW) BTU/hr 3415 meter (m)
  • Page 14 Offered By: Power Equipment Company 2011 Williamsburg Road Richmond, Virginia 23231 Phone (804) 236-3800 (804) 236-3882 www.peconet.com...