Exchange Of Glass; Assembly; Tightening Torques - Igema LG40-CS Installation And Operating Instructions Manual

Reflex level gauge
Table of Contents

Advertisement

Open upper and bottom shutoff device (D1,W1) (if exists) and drain valve
(4). Following that, slowly open upper shutoff device (D2) and steam flowing
through the unit cleans the glasses.
Close upper shutoff device (D2) and drain valve (4) again.
For commissioning see point 7.
If this cleaning was not sufficient, replace glass.

8.4 Exchange of glass

Always place new glass, new gasket and new cushion!
Close shutoff devices (D1,D2,W1,W2).
Open drain valve (4), hence unit is drained.
Unfasten pressure screws (7) and remove.
Remove upper clamping (9).
Remove right clamping ring (10), pressure plate (14), cushion (13), glass
(12), gasket (11) and screw holder (8).
Remove completely remaining gasket and cushion parts.
Clean sealing surface of gauge body as well as contact surface of pressure
plate.

8.5 Assembly:

Insert sealing (11), glass (12), cushion (13) and pressure plate (14).
Install glass with grooves turned to the medium!
Grease pressure screws (7) with suitable lubricant, screw into screw holder
(8) and insert.
Insert clamping ring (10).
Install clamping (9).
Tighten pressure screws loosely and then in several steps according to the
table (see point 8.6) starting in the centre using successively opposite
diagonal tightening up to a tightening torque Md
For re-commissioning see point 7.

8.6 Tightening torques

Max.
Pressure
PS
1
32
30
12
Tightening torque
Md → Md
[Nm]
max
steps
2
45
= 60 Nm.
max
3
60

Advertisement

Table of Contents
loading

Related Products for Igema LG40-CS

Table of Contents