Sicor SG30 Operation And Maintenance Manual

Sicor SG30 Operation And Maintenance Manual

Hide thumbs Also See for SG30:

Advertisement

OPERATION AND MAINTENANCE MANUAL
SG30
COD.: MUM0214 REV. 02
SICOR S.p.A.
Head Office and Production Centre
Viale Caproni 32 (Industrial Area) 38068 Rovereto (TN) Italy
Copy of the original file MUM0214_REV02 Italian

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SG30 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sicor SG30

  • Page 1 OPERATION AND MAINTENANCE MANUAL SG30 COD.: MUM0214 REV. 02 SICOR S.p.A. Head Office and Production Centre Viale Caproni 32 (Industrial Area) 38068 Rovereto (TN) Italy Copy of the original file MUM0214_REV02 Italian...
  • Page 2: Table Of Contents

    SG30 INDEX LETTER TO THE CUSTOMER ....................2 DESCRIPTION OF THE GEARLESS MACHINE ..............2 2.1. DIMENSIONS/TECHNICAL SPECIFICATIONS SG30 ............3 2.2. DIMENSIONS/TECHNICAL SPECIFICATIONS SG30F ............4 MACHINE IDENTIFICATION ....................5 WARRANTY ........................6 GENERAL DELIVERY NOTES ....................7 SAFETY PRECAUTIONS .......................8 SAFETY REQUIREMENTS ....................9 MOVING THE WINCH ......................11 NOTES FOR INSTALLATION ....................13...
  • Page 3: Letter To The Customer

    SG30 LETTER TO THE CUSTOMER Dear Customer, SICOR gearless machines are designed and manufactured in accordance with the Machinery machine was delivered; that this manual has been delivered with the machine and that the DESCRIPTION OF THE GEARLESS MACHINE for handling cable elevator systems.
  • Page 4: Dimensions/Technical Specifications Sg30

    SG30 2.1. DIMENSIONS/TECHNICAL SPECIFICATIONS SG30 Ø D1 Max Weight System S3 40% Load Power** [mm] [mm] [mm] [kg] [kgm²] [Nm] [kW] 0,15 0,19 0,27 0,30 0,42 11,1 0,53 0,60 0,78 1,07 Standard Encoder Data 2x410 [Nm] Heidenhain [V DC] Model...
  • Page 5: Dimensions/Technical Specifications Sg30F

    SG30 2.2. DIMENSIONS/TECHNICAL SPECIFICATIONS SG30F Ø D1 Max Weight System S3 40% Load Power** [mm] [mm] [mm] [kg] [kgm²] [Nm] [kW] 0,15 0,19 0,27 0,30 0,42 13,9 0,53 0,60 0,78 1,07 Standard Encoder Data 2x410 [Nm] Heidenhain [V DC] Model...
  • Page 6: Machine Identification

    SG30 MACHINE IDENTIFICATION...
  • Page 7: Warranty

    SG30 WARRANTY • recognised as faulty. Labour, travel and board and lodging costs must be met by the Customer. • • gaskets, revolving bearings. • • Customer under warranty or will send its own technicians.
  • Page 8: General Delivery Notes

    SG30 GENERAL DELIVERY NOTES there is no visible damage to the gearless machine or its accessories detail. Machine data sheet Work Order...
  • Page 9: Safety Precautions

    SG30 SAFETY PRECAUTIONS or similar). WHEN THESE WARNINGS APPEAR, PROCEED WITH THE UTMOST CAUTION.
  • Page 10: Safety Requirements

    SG30 SAFETY REQUIREMENTS Before installing the gearless machine the customer must verify that the concrete slab and/or the factors. LIFTING EXCLUSION OF POWER SOURCES WARNING Do not lean and/or sit on the gearless machine, either when it is in or out of service.
  • Page 11 SG30 MALFUNCTIONS.
  • Page 12: Moving The Winch

    SG30 MOVING THE WINCH WARNING RISK OF CRUSHING, IMPACT AND ABRASION WARNING WARNING • lay the crate on the ground slowly • •...
  • Page 13 SG30 CAUTION machine.
  • Page 14: Notes For Installation

    MECHANICAL INSTALLATION WARNING For other values, consult SICOR. The customer must make sure that the electrical system has suitably gauged cables, is correctly Allow a minimum of 80 mm between the encoder and the wall so that it is always accessible...
  • Page 15: Cable Installation

    SG30 9.1.1. CABLE INSTALLATION in any way. 9.1.2. SECURING THE GEARLESS MACHINE SG30 Screws [Nm]...
  • Page 16: Cable Guard

    SG30 9.1.3. CABLE GUARD...
  • Page 17: Electrical Installation

    SG30 9.2. ELECTRICAL INSTALLATION connected. 9.2.1. ELECTRIC MOTOR DO NOT CONNECT THE MACHINE DIRECTLY TO THE POWER GRID. THE POWER MUST BE SUPPLIED BY A SUITABLE ELECTRONIC CONVERTER. IMPORTANT NOTE Thermistors The thermistors MUST ONLY BE CONNECTED TO A SPECIFIC DEVICE.
  • Page 18: Terminal Board Wiring Diagram

    SG30 9.2.2. TERMINAL BOARD WIRING DIAGRAM Thermistors L1 L2 L3 of the thermistor...
  • Page 19: Encoder

    SG30 9.3. ENCODER • Absolute rotary encoder with EnDat interface; • Rotary encoder with Sin/Cos interface;...
  • Page 20 SG30 9.3.1. connected or disconnected. 6/10/15/20/25 m inverter side connector. • 6/10/15/20/25 m C1 MINITEK 12 PIN WIRE COLOUR SIGNAL Brown Green CLOCK Violet White Red/Blue Grey DATE Pink Grey/Pink Blue Sensor 0 V Black Yellow Sensor 5 V...
  • Page 21 SG30 EXTENSION CABLE LENGTH MORE THAN 25 METRES connected or disconnected. extensions over 25 m 0.3m • CABLE LENGTH OF MORE THAN 25 METRES C2 17 PIN WIRE COLOUR SIGNAL Blue White Brown/Green Violet CLOCK Yellow White/Green Blue/Black Red/Black Grey...
  • Page 22: Rotary Encoder Sin/Cos Interface Configuration

    SG30 9.3.2. ROTARY ENCODER SIN/COS INTERFACE CONFIGURATION extension cables is necessary in order to connect this encoder to the inverter. Please refer to the table below to connect the encoder to the inverter. connected or disconnected. 6/10/15/20/25 m inverter side connector.
  • Page 23: Instructions For Installing The Extension Cable On The Heidenhain Endat Ecn 1313 Encoder

    SG30 9.3.3. INSTRUCTIONS FOR INSTALLING THE EXTENSION CABLE ON THE HEIDENHAIN ENDAT ECN 1313 ENCODER of the encoder • • •...
  • Page 24 SG30 • Bushing Bushing • The removal of the extension cable is not recommended, if this is unavoidable carry out the...
  • Page 25: Electromagnetic Brake

    SG30 9.4. ELECTROMAGNETIC BRAKE be controlled. The two brake circuits MUST be monitored manual. descent of the elevator.
  • Page 26: Emc Directive

    SG30 IMPORTANT NOTES values. between 10mA min. and 50 mA max. at 24V DC. DO NOT use detergents containing solvents and/or oily 9.4.1. EMC DIRECTIVE...
  • Page 27: Manual Brake Release Lever Remote Control Kit

    SG30 9.4.2. MANUAL BRAKE RELEASE LEVER REMOTE CONTROL KIT device of 2.5 m or 5 m in length. • Block the cabin booth and the counterweight. • • Insert the Bowden cable into the brake release levers minimum curvature radius of 200 mm.
  • Page 28 SG30 Manual emergency manoeuvre is a dangerous task. It can be used to move the cab involved.
  • Page 29: Manual Brake Release Lever Extension Kit

    SG30 9.4.3. MANUAL BRAKE RELEASE LEVER EXTENSION KIT device • Manual emergency manoeuvre is a dangerous task. It can be aware of the risks involved.
  • Page 30: Power Supply Unit

    SG30 9.5. POWER SUPPLY UNIT [VAC] [VDC] bridge FF315A Terminals...
  • Page 31: Power Supply Unit Electrical Connection Drawings

    SG30 9.5.1. POWER SUPPLY UNIT ELECTRICAL CONNECTION DRAWINGS max. 250V~ 2,5A - 1/025.000.6 [U- =0,9xU~] Full-wave rectifier Bridge max. 250V~ 2,5A - 1/025.000.6 [U- =0,9xU~] Full-wave rectifier Bridge...
  • Page 32 SG30 max. 250V~ 2,5A - 1/025.000.6 [U- =0,9xU~] Full-wave rectifier...
  • Page 33: Starting The Gearless Machine For The First Time

    SG30 STARTING THE GEARLESS MACHINE FOR THE FIRST TIME data. CAUTION WARNING by the EN 81.1 standard. The system can now be handled.
  • Page 34: Maintenance

    SG30 MAINTENANCE of this manual. CAUTION gloves, safety shoes). materials WARNING The gearless machine MUST NEVER BE OPENED.
  • Page 35: Encoder Replacement

    SG30 11.1. ENCODER REPLACEMENT Loosen the screw on the outer ring with an Allen key Remove the cover on the rear Remove the M10 screw; Remove the encoder Figure 1...
  • Page 36: Ventilation Kit

    SG30 Remove the cover on the rear of the encoder Place the encoder inside the housing, taking care to centre the cone of 1.25 Nm THE HEIDENHAIN ENDAT ECN 1313 ENCODER) and close the cover with the Allen wrench SW3/ PROCEDURE).
  • Page 37: Pulley Dismantling

    SG30 11.3. PULLEY DISMANTLING Unscrew the retaining screws Tighten the nuts on the screws Figure 4 Figure 3...
  • Page 38: Pulley Assembly

    SG30 11.4. PULLEY ASSEMBLY Tighten the bolts of 90 Nm. Figure 5 EMERGENCY OPERATION gearless machine. IN THIS CONDITION THE CABIN WILL MOVE DOWNWARD OR UPWARD DEPENDING ON THE LOAD AND/OR BALANCE CONDITIONS OF THE SYSTEM. WARNING WHEN THE MOTOR IS NOT POWERED, IT IS UNABLE TO GENERATE TORQUE. IN THIS SITUATION,...
  • Page 39: Disposal/Recycling

    SG30 DISPOSAL/RECYCLING...
  • Page 40 SICOR S.p.A. Head Office and Production Centre Viale Caproni 32 (Industrial Area) 38068 Rovereto (TN) Italy...

Table of Contents