Kohler K-1737-K1 Installation And Care Manual page 7

Steam adapter kit / steam head for dtv+
Hide thumbs Also See for K-1737-K1:
Table of Contents

Advertisement

Available languages

Available languages

X
Subtract 1-1/4"
(32 mm) from the
marked length.
X
Apply
thread
sealant.
3. Install the Steam Head(s)
NOTICE: Do not obstruct the steam head with shut-off valves,
plugs, or caps.
Subtract 1-1/4" (32 mm) from the marked length on the
temporary nipple to determine the appropriate nipple size.
Choose a nipple length within 1/8" (3 mm) of the appropriate
size.
Apply thread sealant to one end of the nipple and thread into the
housing until hand-tight.
Apply thread sealant to the other end of the nipple.
Position the gasket onto the housing so it will sit between the
finished wall and the housing flange.
Use a 1" socket to thread the housing into the elbow.
Make sure the gasket is compressed to achieve a good seal
around the housing.
If needed, use an appropriate sealant to achieve a watertight seal.
Press the steam head into the housing with the well positioned at
the top.
Kohler Co.
Elbow
Gasket
Housing
Apply thread
sealant.
7
Well
Flange
Steam Head
1235393-2-C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-5549-k1K-1838-k1K-5548-k1

Table of Contents