End User; Start-Up; Temporary Shutdown; Preparing For Extended Periods Of Disuse - Beretta IDRA MS 200 Installation And Operation Manual

Solar storage cylinder
Hide thumbs Also See for IDRA MS 200:
Table of Contents

Advertisement

END USER INSTRUCTIONS
Refer to the GENERAL SAFETY INFORMATION and PRECAUTIONS section for safety-related information.

21 START-UP

The storage cylinder must be put into service for the first
time by personnel from the manufacturer's Technical
Assistance Centre.
Under certain circumstances, such as after long periods of
disuse, the user may need to re-start it without involving the
Technical Assistance Centre. Before doing so, perform the
following checks and operations.
- Check that the supply cocks in the domestic water
circuit are all open
- Switch the electricity supply ON at the mains power
switch and at control panel switch (if fitted).

22 TEMPORARY SHUTDOWN

To reduce impact on the environment and save energy,
before leaving for the weekend or a short break, etc.,
provided outdoor temperatures will remain above ZERO,
simply adjust the storage cylinder's thermostat to its
minimum temperature.
b
If outdoor temperature may drop below ZERO (risk
of freezing) perform the operations described in the
"Preparing for extended periods of disuse" section.
23 PREPARING FOR EXTENDED
PERIODS OF DISUSE
If the storage cylinder is not going to be used for an
extended period of time, ask the manufacturer's Technical
Assistance Centre to make the system safe.

24 EXTERNAL MAINTENANCE

Clean the cover, painted and plastic parts with a cloth
damped in soap and water. To remove stubborn marks,
use a cloth damped in a 50% mix of water and denatured
alcohol or a suitable cleaning product.
b
Do not use fuels, sponges impregnated with abrasive
solutions or powder detergents.

End user

15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Idra ms 300Idra ms 550Idra ms 430

Table of Contents