Operation Manual / 4 Product description / TPS44-H.. - TPS52-H..
3 Commissioning / 3.3 Commissioning after taking out of operation
3.3

Commissioning after taking out of operation

If present
Remove cover plates (blind flanges) from the compressor casing, the gas inlet and the
u
gas outlet.
Remove the locking screws on the water connections and fit the water pipe.
u
General
Check the exhaust gas pipe before and after the turbine for combustion residues or wa-
u
ter residues and clean it. Remove any foreign objects that may be present.
Check and clean filter silencer or air supply line, and remove any foreign objects that may
u
be present.
Put engine-side oil circulation to the turbocharger into operation.
u
Prepare the turbocharger for operation according to section "Checks before commission-
u
ing".
The turbocharger is now ready for operation.