Shelf-Installation Guidelines; Before Installing The Shelf Brackets - Cisco MDS 9148T Hardware Installation Manual

32-gbps 48-port fibre channel switch
Hide thumbs Also See for MDS 9148T:
Table of Contents

Advertisement

Shelf-Installation Guidelines

Note
Telco and EIA Shelf Bracket optional kit is not provided with the switch; to order the kit, contact your switch
supplier.
This section describes the procedure for installing a Cisco MDS 9148T switch in a rack or cabinet using the
optional Telco and EIA Shelf Bracket Kit.
Shelf-Installation Guidelines
Caution
• If the rack is on wheels, ensure that the brakes are engaged or the rack is otherwise stabilized.
• If you are installing this kit in an EIA rack, attach the shelf to all four rack-mounting posts; the EIA posts

Before Installing the Shelf Brackets

Before installing the shelf brackets, inspect the contents of your kit. The following table lists the contents of
the shelf bracket kit:
Quantity
2
2
1
2
16
16
Required Equipment
You need the following equipment for this installation:
• Number 2 Phillips screwdriver
• Tape measure and level (to ensure that shelf brackets are at level with each other)
Installing the Shelf Bracket Kit into a Two-Post Telco Rack
The following figure shows the installation of the shelf bracket kit into a two-post Telco rack:
Cisco MDS 9148T 32-Gbps 48-Port Fibre Channel Switch Hardware Installation Guide
20
may not be thick enough to prevent flexing of shelf brackets if only two posts are used.
Installing the Cisco MDS 9148T Switch
Part Description
Slider brackets
Shelf brackets
Crossbar
10-32 x 3/8-in. Phillips pan-head screws
12-24 x 3/4-in. Phillips screws
10-24 x 3/4-in. Phillips screws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents