5
Installation and Operation
5.1
Unpacking
Carefully unpack the diaphragm pump.
Check the pump for:
Transport damage,
Conformity with the specifications of the supply contract (type, electrical supply data),
Completeness of the delivery.
Please inform us without delay if there are discrepancies between the delivery and the con-
tractually agreed scope of delivery, or if damage is detected.
Please take note of the general terms of business of the manufacturing firm.
In case of a claim under warranty, the device must be returned in packaging that is
suitable for protecting it during transport.
5.2
Installation and Connection
1. Set the diaphragm pump on a flat and horizontal surface.
2. Remove the protective caps on the suction and pressure ports.
3. Prepare the connections.
4. Connect the vacuum connector to the suction port.
5. Connect the exhaust pipe to the pressure connection.
6. Connect the diaphragm pump to the electrical supply.
5.3
Operation
Observe the basic safety instructions when using the pump.
The diaphragm pump is switched on and off at the operating switch.
The operating company must install a main switch for pumps with terminal boxes.
5.4
Storage
The pumps are to be stored in a low-dust, interior room within the temperature range from
+ 5 to + 40 °C and at a relative air humidity < 90%.
Leave the protective elements on the suction and pressure ports. Another equally good pro-
tection may be used.
5.5
Scrap Disposal
The diaphragm pumps must be disposed of in accordance with the 2012/19/EU
guideline and the specific national regulations.
Contaminated diaphragm pumps must be decontaminated according to the laws.
412721
Installation and Operation
CAUTION !
13