EP-100 Pump Installation, Operation & Service Manual Installer WARNING Please take the time to read and understand Improper installation, adjustment, alteration, service these instructions prior to any installation. or maintenance can result in death, injury or Installer must give a copy of this manual to the owner.
SECTION 1: H EATING YSTEM AFETY SECTION 1: HEATING SYSTEM SAFETY Your Safety is Important to Us! 1.1 Manpower Requirements This symbol is used throughout To prevent personal injury and damage to the pump, the manual to notify you of two persons will be required for installation.
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL FIGURE 1: Label Placement Description Part Number Severe Injury Label 91012100 Rating Plate Label 91010401 Logo Label 91017200 2 of 29...
SECTION 2: I NSTALLER ESPONSIBILITY SECTION 2: INSTALLER RESPONSIBILITY 2.1 Corrosive Chemicals The installer is responsible for the following: CAUTION • To install the pump and electrical supplies, in accordance with applicable specifications and codes. Roberts-Gordon LLC recommends the installer contact a local building inspector or fire marshal for guidance.
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL SECTION 3: UNPACKING PUMP 3.1 Open Shipping Cartons WARNING Cut/Pinch Hazard Wear protective gear during installation, operation and service. Edges are sharp. Failure to follow these instructions can result in injury. Open cartons and remove packing inserts. Carefully remove pump components from cartons.
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL 4.1 Standard Parts List Table 1: EP-100 Pump Package 4" (10 cm) (P/N 02719105) Part No. Description Quantity Box 1 of 2 02719100 Pump Frame, Motor and Impeller Assembly Includes: ® 127102NA CORAYVAC...
SECTION 5: P NSTALLATION SECTION 5: PUMP INSTALLATION WARNING Cut/Pinch Hazard Wear protective gear during installation, operation and service. Edges are sharp. Failure to follow these instructions can result in injury. NOTE: Installers may also visit Roberts-Gordon YouTube page to view pump assembly video at https://www.youtube.com/watch?v=F-u8xtvaAZ8 or scan the QR code below: WARNING...
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL FIGURE 3: Pump Discharge Orientation/Impeller Rotation Direction Counterclockwise Rotation (Standard) OUTLET Arrow showing direction of rotation (located on front of scroll housing) Clockwise Rotation OUTLET 5.1.2 Attaching Pump Scroll After determining correct orientation of pump scroll outlet, attach pump scroll to pump frame using #10 - 24 Keps locknuts provided.
SECTION 5: P NSTALLATION 5.1.3 Attaching Pump Inlet Assembly From scroll assembly side of pump, orient inlet assembly so threaded pipe coupling is on top. See partial end view on Page 9, Figure 4. • Attach inlet assembly onto scroll assembly by using #10 - 24 Keps locknuts provided.
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL 5.1.4 Damper Assembly Pump is equipped with a damper assembly which is 2. Pump inlet assembly is provided with a 1/8" used as a means of setting system vacuum. See N.P.T. tapping which is located at the top. Use...
3. Secure shaft seal in position with adhesive strip provided. FIGURE 6: Motor Shaft Seal Installation Pump Scroll Motor Shaft Seal Pump Frame Impeller Pump Inlet Assembly EP-100 Motor Description Part Number EP-100 Motor 90604600 Motor Shaft Seal 02757500 Pump Scroll...
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL SECTION 6: PRESSURE SWITCH MOUNTING AND WIRING 6.1 Pressure Switch Installation eliminate the possibility of kinks and securely attach hose to pressure switch and barbed fitting. For connection to a pump, locate two pressure switch mounting holes on pump frame.
SECTION 7: P OUNTING NSTRUCTIONS SECTION 7: PUMP MOUNTING INSTRUCTIONS The standard method of mounting the EP-100 pump is suspending it from a chain and venting through the 7.1 Chain Suspension roof. For CRVSF-Series only, a minimum of 18" (45 cm)
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL 7.2 Wall Mounting 7.2.1 Wall Mounting Platform The alternative method of mounting the pump is on an outside wall and venting directly through the wall. Order the optional mounting angle package (P/N 01312102) if this method is used.
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL 7.2.3 Mounting Platform (Optional Platform Assembly) If mounting on an outside wall is not practical, it may be mounted on a platform suspended from the ceiling, or for noise reduction, in an enclosure.
8.2 EP-100 Wiring The EP-100 motor is wired for 1 Ø, 115 V, 60 Hz operation. However, the motor can be rewired for 230 V operation by changing motor connections as indicated by the diagram on motor.
SECTION 9: V ENTING • Vent must terminate at least 3' (1 m) above any • Vent terminal opening must extend beyond any forced air inlet located within 10' (3 m). combustible overhang. • Vent must terminate at least 4' (1.2 m) below, 4' •...
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL 9.5 Vertical Venting Vent length should be limited to less than 30' (9 m). If using vent lengths greater than 30' (9 m), condensation will form in vent pipe. Insulation and additional sealing measures will be required. Length of flue pipe is equal to total of vertical and horizontal length.
9.6 Condensate Trap and Condensate Tee Install condensate trap assembly (optional) (P/N horizontal (pitched) discharge line. 01327001), on inlet side of EP-100 Series pump The condensate trap assembly in the discharge line assembly, See Page 21, Figure 17. can be eliminated if the discharge line is horizontal...
Page 28
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL 9.6.1 Condensate Neutralization Tube (optional) Step 2: Total condensate If a condensate neutralization tube is specified to be Multiply the total input Btu/h / 100,000 by the used with the heating system, follow the steps below condensate flow (gal/h) per 100,000 (Btu/h) to choose the proper condensate neutralization tube.
SECTION 9: V ENTING FIGURE 19: Condensate Neutralization Tube Calculated gal/h Description Part Number Less than 2 Condensate Neutralization Tube 200 01327002 Less than 6 Condensate Neutralization Tube 600 01327003 Less than 10 Condensate Neutralization Tube 1000 01327004 Less than 20 Condensate Neutralization Tube 2000 01327005 23 of 29...
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL SECTION 10: SERVICING INSTRUCTIONS WARNING DANGER Electrical Shock Hazard Explosion Hazard Burn Hazard Cut/Pinch Hazard Turn off gas supply to Allow heater and Wear protective gear Disconnect electric heater before service. pump to cool before during installation, before service.
SECTION 10: S ERVICING NSTRUCTIONS 6. Detach motor, if necessary, by removing 8. Two impeller set screws should be reinstalled attachment hardware. with a drop of thread locking sealant and remain unseated during initial re-assembly. 7. Re-assembly of motor/impeller combination requires proper alignment.
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL SECTION 11: REPLACEMENT PARTS AND ACCESSORIES WARNING DANGER Electrical Shock Hazard Explosion Hazard Carbon Monoxide Hazard Fire Hazard ® Use only genuine ROBERTS GORDON replacement parts per this installation, operation and service manual.
EP-100 P NSTALLATION PERATION AND ERVICE ANUAL SECTION 12: SPECIFICATIONS 12.1 Material Specifications 12.3 Controls Specifications 12.1.1 Pump Frame, Inlet, Scroll and Impeller Time switches, thermostats, etc. can be wired into electrical supply. External controls supplied as an 12 Gauge Stamped Steel Construction optional extra.
• Misuse, abuse, neglect, or modification of the EP-100 PUMP in any way. Roberts-Gordon LLC shall in no event be responsible • Use of the EP-100 PUMP for other than its intended for incidental or consequential damages or incur purpose.