Advertisement

Quick Links

VIBRATION ANALYSIS HARDWARE
Product Manual
MNX10050 / REV C
Field Installable Connector Kits
MODELS:
CC-AXX & JXX
CC-C2X & C3X
CC-V2R & V3R

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CC-JXX Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for CTC Union CC-JXX Series

  • Page 1 VIBRATION ANALYSIS HARDWARE Product Manual MNX10050 / REV C MODELS: CC-AXX & JXX CC-C2X & C3X CC-V2R & V3R Field Installable Connector Kits...
  • Page 2: Table Of Contents

    Description..................2 Section II Installation CC-AXX, JXX, C2X, C3X, V2X, V3X Series .………………...………......3 Wire Prep, Soldering, Crimping Connector Assembly CC-AXX & CC-JXX Series………………………………………………………...….. CC-C2X & CC-C3X Series……………………………………………………………. CC-V2X & CC-V3X Series ……………………………………………………………. Section III Operation Operating Procedure................. 8 Section IV Maintenance General....................
  • Page 3: Section I

    Section I Overview Introduction This document contains information on the operation, installation and maintenance of the CC-AXX, CC-JXX, CC-C2X, and CC-C3X Series Connectors. This manual is an overview of the field installable connector assemblies. Description These field installable connector kits are designed for field installation of common connectors.
  • Page 4: Installation

    Section II Installation Wire Preaparation NOTE: If assembling a CC-V2X or CC-V3X Series connector, the Viton seal-tight boot must be fed onto the CB111 or CB119 cabling BEFORE crimping or soldering the sockets onto each conductor. See photo below. 1. Strip outer jacket of wire 3/8”. 2.
  • Page 5: Connector Assembly

    Connector assembly Table II.I Cable 2 Pin 3 Pin 4 Pin Black White Green CC-AXX & JXX 1. Feed strain relief and knurled ring on cable. 2. Insert and press sockets into specified hole, see table II.I 3. Slide the knurled ring over the threaded section of the connector plug. 4.
  • Page 6: Cc-C2X & Cc-C3X Series

    CC-C2X & C3X 1. Slide o-ring over connector insert and press socket into specified holes, see table II.I O-Ring 2. Slide locking nut over connector insert. 3. Insert twisted shielded pair wire through backshell and silicone shell. 4. Assemble as shown: Push in then silicone shell Figure 3 –...
  • Page 7: Cc-V2X & Cc-V3X Series

    CC-V2X & CC-V3X Assembly Instructions 1. Feed the backshell onto the cable toward the Viton seal-tight boot, as shown in Figure 4 below. 2. Press the soldered sockets assembled on the end of the cable into the connector insert using the following wiring chart: Cable Black White...
  • Page 8 4. Position the now assembled connector body vertically with the open end of the connector facing up, as seen in Figure 6 below. 5. Fill the strain relief backshell with epoxy to the top of the backshell 6. Allow the epoxy to dry. Drying time can be reduced by adding a heat lamp set on low for approximately 20 minutes.
  • Page 9: Operation

    Section III Operation Assembled connectors, after adhesive cure, can be attached to sensors as normal. Section IV Maintenance General There are no customer replaceable parts on the Connector Kits. The product should provide trouble-free continuous service under normal operating conditions. Warranty If any CTC vibration analysis hardware product should ever fail, we will repair or replace it at no charge.

Table of Contents