Polar Electro Team2 Manual page 63

Hide thumbs Also See for Team2:
Table of Contents

Advertisement

The number of seasons is not limited per team.
Planning
Seasons are planned with the Training seasons feature. To open Training seasons window, click
the Plan season button on the Training Calendar page or select Options > Plan season.
To start planning of new season, click the New button. The default name of the first season is
Season1. By clicking the name of the season, Season name text field below Seasons list is
enabled.
There are shown the following information in the Seasons list:
Season (name)
Start (start date)
Duration (duration of season is calculated automatically and is determined by the
training periods)
End (end date)
Number of periods (number of planned training periods)
By default duration of a season is 1 day and the start date is the creation day (today). The end
date is set automatically according to the duration of the season. Start and end dates and the
duration of season are changed by planning and modifying training periods.
The second season is created again by clicking the New button. By default the next season
begins on the very next day the previous season has ended. This can be changed.
Season can be deleted by clicking the name of the season and clicking the Delete button. NOTE:
A season is deleted without confirmation!
Training seasons changes are taken into use by clicking OK and declined by clicking Cancel.
More information can be found on the
Training Periods
Training periods
page.
Team2 SW help
57

Advertisement

Table of Contents
loading

Table of Contents