Hitachi Compute Blade 500 Installation Manual page 25

Compute blade embedded 10g dcb switch module
Hide thumbs Also See for Compute Blade 500:
Table of Contents

Advertisement

(2) Checking server operation status
If the DCB Switch is operating while installing the license, the communication
lines of the Switch may be confused. This may result in loss of connection to
servers or devices (such as servers and disks), which may cause system down.
If you install a license and download configuration information while servers are
operating, be sure to follow the steps shown below.
START
Can all Compute Blade
servers be stopped?
Have servers
connected embedded
DCB switch all stopped?
Is it acceptable that the
communication of
servers with embedded
DCB switch which
license installation
target is stopped?
With this configuration, you need to stop
all servers to proceed license installation.
Wait until all servers can be stopped.
Hitachi Compute Blade Embedded 10G DCB Switch Module License Installation Guide
Warning
Yes
No
Yes
No
Yes
No
Pre-confirmation
Stop all servers and go to
Section 2 (Confirm the DCB Switch's
WWN).
You can proceed license installation.
Go to Section 2 (Confirm the DCB Switch's
WWN).
3-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Compute blade 2500Compute blade 2000

Table of Contents