SHOVELUTION
ASSEMBLY INSTRUCTIONS
A Division of Snow Joe
HANDLE IS SPRING LOADED UNDER HEAVY TENSION.
To avoid injury, securely grasp handle before cutting zip ties.
Then, remove retaining strap and save for later storage.
TO ASSEMBLE:
1. Depress the small button at the end
of the lower pole, push and insert the
lower pole into the poly blade unit until
it snaps securely into place.
2. Remove the knob and the bolt from
the upper pole.
3. Insert the top of the lower pole into the
upper pole.
4. Align bolt holes, insert the bolt into the
square hole, through pole.
5. Tighten with the knob.
TO DISASSEMBLE:
Follow instructions above in reverse order.
FOR STORAGE:
Make a loop with the retaining strap around the spring-loaded
handle, and with the other end, secure to knob on the upper pole.
NOTE: If you have further questions, please contact the Snow Joe
customer service center at 1-866-SNOWJOE (1-866-766-9563).
Model SJ-SHLV01
, LLC
®
m
18" SNOW SHOVEL
TM
CAUTION!
poly blade
unit
© 2018 by Snow Joe
All rights reserved. Original instructions.
upper
pole
knob
lower
pole
+ Sun Joe
®
®
R
, LLC
®
bolt
Need help?
Do you have a question about the SJ-SHLV01 and is the answer not in the manual?
Questions and answers