Acer Altos R720 Series User Manual page 56

2u rack optimized server
Hide thumbs Also See for Altos R720 Series:
Table of Contents

Advertisement

46
To remove the large air baffle:
1
Observe the ESD precautions and pre-installation instructions
described on page 35.
2
Note how the cables are routed over and under the air baffle. You
will need to re-route these cables later.
3
Disengage the air baffle and pull it out of the chassis.
To install the small air baffle:
1
Observe the ESD precautions and pre-installation instructions
described on page 35.
2
Engage the air baffle into its chassis slot.
3
Observe the post-installation instructions described on page 36.
3 System upgrade

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents