Preparing
Balersare thoroughlytested and carefull
r
are ready tor immediate service at fu,l capacity when observing the following
instruetions.
Attaching the Baler
Connect to traetor possibly without play, usa
the same dia. hole in traetor drawbar and
baler drawbar are. Standard fitting on baler
22 mm dia. drawbar eye (also available with
32 mm dia. hole).
Stabilize traetor hitch or drawbar. Set baler
info horizontal position by turning handle 2
(fig. 1) and conneet to tantra of traetor hitch
or drawbar. If necessary re-set hitch on baler
drawbar according to height, side displacement
can be made up to 160 mm. Secure safety chain
of conneeting pin around front of drawbar.
Retraet jack till stop by turning handle 2 (fig. 1).

Positioning Drawbar

Release bell 3 (fig. 2) and lock (operation of
bell 3 is also possible with a puUing rope from
traetor seal). Swing baler info position A or B
and re-positi,on bell 3 again.
ATTENTION!
Usa drawbar jack when storing baler, mind pin-
thing po,ints on swivel drawbar.
Hydraul,ic operated drawbar shifting device is
ava,i:lable as specia,! equipment tor AP 53.
ShiUing device is opera ted through traetor
hydraul,ic. The traetor must be equipped with
double aeting hydraulic valve.
4
tor Work
lubricated before leaving our werks and
1
FiHingthe Universal Drive Shaft
Clean splines on traetor and baler pto from
proteeting grease. Press in slide pins and fit
joints on both stubs (fig. 3), slide pins must snap
info position. Secure safety chai,n on to draw-
bar. Fold joint prop 4 away to the rear as
shown in fig. 1, see arrow.
Clearance between pro end and traetor draw-
bar hole (distance C in fig. 3) should be 330-
600 mm. Usa Ionger pro shaft (size h) if distance
is more thon 600 mm. If i.t is smaller thon
330 mm, fit a drawbar extension. Telescoping
length of PTO-shaft tubes (distance D in fig. 3)
should be at least 300 mm when driving straight
ahead. If necessary, shorten shaft by cutting off
equallengths from euter and inner tubes.
Cleaning KnoHers
Carefully clean knotter beaks and twine re-
tainers (see arrows in fig. 4), so thaI the twine is
securely held and cannot wind round the twine
retainer shaft.

Inserting Twine Spools

Only usa baling twine of best quality, see
technical data page 3. Place tour spools of
twine (fig. 5) side-by-side in upright position
info the twine box (wrongly inserted spools may
lead to tangled twi.ne and breakage). Four
balls of twine can be stored in the additional
~
"
twine box (AP53).
Pull twine end from spool E out of paper cover
and join to twine start of spool F (conneet
spool G and H in the same manner).
Plastoietwine allows any normal knot, but a
special knot is recommended tor si,sal twine as
fellows :
Rough up and untwist both ends. Make a single
knot, spließ and roll open ends together as
per fig. 6. Now hold ends closed (fig. 7) and
fighten the knot slowly.
Give knot a final hard lug and roll proieeting
ends between hands. Properly made, this spe-
cial knot (fig. 8) is hardly thicker thon the twine
itself.
I-
fig.4
fig. 5
fig. 6
fig, 7
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap 38Ap 53dAp 48Ap 53Ap 48d

Table of Contents