Pre-Installation Requirements Checklist; Touch Screen - Panasonic JS970 Pre-Installation Manual

Touch screen point-of-sale system
Hide thumbs Also See for JS970:
Table of Contents

Advertisement

Pre-Installation Requirements Checklist

 Install the ORANGE ISOLATED GROUND (IG) electrical receptacles as
per the enclosed specifications.
 Install the CAT5 data communications cable as per the enclosed
specifications.
 Install a CAT5 data communications cable from the switch to the
burger chute order printer.
 Install the CAT5 kitchen video monitor system (KVS) VIDEO cable as per
the enclosed specifications.
 Install the CAT5 cable for the kitchen video monitor system (KVS) BUMP
BAR as per the enclosed specifications.
 Install the 30' Audio Cable from the bump bar to the Grill Monitor as
per enclosed specifications
 Install the kitchen video monitor system (KVS) MONITOR MOUNT
BRACKETS. Installation instructions are included with each mounting
bracket. Please refer to the building plans for mounting locations.
 Cut the 1 ½" HOLES in the counters for the cables to pass through.
Holes should be center of where the cash register sits, approximately 6"
in from the front of the cash register center.
 The CASH DRAWER dimensions are 17 ½" Wide X 18 ¾" Deep X 4 ¾"
High (tight measurement).
A QSR representative will be contacting you prior to your installation to confirm the
completion of the pre-installation checklist.
Should you require and additional information, please do not hesitate to contact us
during regular business hours (Mon - Fri 8:30am – 5:00pm PST) at:
Orion Mengistu 1-855-465-8912 ext 104 (Setup/Installation Manager)
English Touch Screen Cable Kit Guide V970 2.2.docx QSR Solutions
A&W Food Services of Canada Inc.
Thank You!
Page 2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents