Checking The Condensate Drain Pipe; Visual Inspection Of Appliance; Checking The Gas Supply Pressure; Water Inhibitor Concentration - Biasi Inovia 25S ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for Inovia 25S ERP:
Table of Contents

Advertisement

10.10 Checking the condensate drain
pipe
The condensate drain pipe 35 (Fig. 10.19)
does not require any particular maintenance
but just check:
• That no solid deposits have formed, if so re-
move them.
• That the condensate drain piping is not
clogged.
To clean the inside of the siphon, remove it
and turn it upside down to remove any dirt.
Fig. 10.19

10.11 Visual inspection of appliance

Visually inspect all water joints, seals and
connections for any evidence of leakage and
retighten, grease or replace them as neces-
sary.
MAINTENANCE
10.12 Checking the gas supply pres-
Check appliance for gas tightness.
Re-check operational pressures as described
in section "Checking the gas supply pressure"
on page 55 of this manual.

10.13 Water inhibitor concentration

Where chemical products are used the level
of water treatment should be checked on an
annual basis and re treated after full or partial
drain down.
A conductivity meter can be used to check the
correct concentration of inhibitor in the heat-
ing water.
35
10.14 Setting the boiler flue sweep
With the boiler set in flue sweep mode, it is
possible to exclude some boiler automatic
functions making check and control opera-
tions easier.
• Enter in "programming mode" by sequen-
tially pressing and holding in keys, 13 - 16
and then 17 (Fig. 10.20) for 10 seconds un-
til the letters P01 are displayed on the LCD
display, indicating that "parameter 01" (Fig.
10.21) has been activated.
10
11
12
Fig. 10.20
sure
function
13 14
18
17
16
15
- 75 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

41-583-30

Table of Contents