TRIO-20.0/27.6-TL-OUTD-US (-A)
EN
In addition to what is explained in this guide, the safety and installation
information provided in the techmical manual must be read and followed.
The technical documentation and the interface and management software for
the product are available at www.abb.com/solarinverters.
4.
Installation position -
• Install on a wall or strong structure capable of bearing weight.
• Install vertically with a maximum incline of +/- 5°.
• Maintain minimum clearance measurements shown.
• Ensure sufficient working area in front of inverter for wiring box access.
• Choose a location that allows unobstructed airflow around inverter.
• Position multiple inverters side-by-side, maintaining minimum clearances. Multiple
inverters can also be placed in staggered arrangement.
• Minimum clearances for staggered arrangements include width of inverter plus
additional allowances for inverters arranged above or below.
Environmental checks - See Technical Data,Section
17, to check environmental parameters.
• Maximum operational ambient air temperature
must be considered when choosing location.
Installing the inverter where operating temperatures
exceed specifications will result in power derating.
It is recommended the inverter be installed within
specified temperature range.
Direct sun on left inverter-
Properly installed
use ABB Sun Shade
• Do not install in direct sunlight. If the preferred
mounting location is in direct sunlight, install the ABB
Sun Shield on the inverter in order to provide the
necessary shade.
• Due to acoustical noise (about 50dBA at 1 m) from
inverter, do not install in rooms where prolonged
presence of people or animals is expected.
Air restricted for top
Air restricted by snow
If installed indoors, the inverter must be
left inverter - not
for both inverters - not
inaccessible to unqualified persons.
properly installed
properly installed
5.
When mounting the TRIO, first secure mounting bracket to desired location and then
install wiring box followed by inverter unit. When completely tightened wiring box will
move up to meet inverter. It is recommended to employ flexible conduit methods to
allow for possibility of inverter removal.
• Using a level, position mounting bracket on wall and use as a drilling template.
• Drill required holes using a drill with 10mm bit to a depth of 70mm.
• Attach bracket to wall with ten wall anchors, 10mm in diameter, found in mounting kit.
• When installed in seismic Zone 3 or higher, the five center wall anchors must be fixed
into a wood/steel wall stud or concrete/masonry wall.
• When installing flexible conduit, provide enough conduit to allow for approximately 1"-
1½" of vertical movement between inverter and wiring box.
• Prior to making conductor connections in wiring box, provide enough conductor to allow
for movement of wiring box in final stages.
• Hook wiring box on bracket by inserting heads of rear screws in bracket slots.
• Remove wiring box front cover 08.
• Loosen connector screws 07 to remove coupling cover 04 and store in pocket at rear of
wiring box.
• Locate four bolts protruding from rear of inverter chassis; use as mounting studs and
insert into four associated slots on mounting bracket as shown at right.
• Lift inverter using two people and orient it to bracket so four studs are just above their
associated slots.
NOTE: For easier lifting and handling, an optional lifting kit is available containing
handles and eyebolts that can be attached to holes in side of inverter unit.
• Clamp screw 05 is accessed externally at bottom of wiring box and used to physically
secure wiring box to inverter chassis.
• Push screw 05 upwards until it mates with inverter chassis and thread initially by hand.
• Using a 20mm socket, tighten clamp screw 05 to lift wiring box toward inverter until
mating connectors of wiring box and inverter chassis seat fully.
DO NOT COMPLETELY TIGHTEN AT THIS TIME.
• Once wiring box and inverter are connected via screw 05, push screws 07 upward to
mate with inverter and initially thread by hand.
• Use a 13mm socket wrench to tighten connector screws 07 to at least 13.3 ft-lbs
(18Nm) torque.
• Secure bottom of wiring box to wall bracket by tightening machine screw
through bottom locking tab 31 and into bottom hole of mounting bracket.
• If using rigid conduit, secure the conduit to the inverter using the knockouts.
• Upon completion, replace the front cover of the wiring box 08 and torque screws to at
least 1.8 ft-lbs (2.4Nm) to ensure proper waterproof sealing.
1.
2.
3.
6.
Side-by-side arrangement
Staggered arrangement
01
03
04
02
31
06
05
7.
32
07
08
04
05
01
Mounting bracket
05
Clamp screw
02
Wiring box
06
Handles (optional)
03
Inverter
07
Connector screws
04
Coupling
08
Wiring box cover
connector cover
31
Bottom locking tab

IMPORTANT SAFETY INSTRUCTIONS

SAVE THESE INSTRUCTIONS-KEEP IN SAFE PLACE!
The labels on the TRIO inverter carry the markings, main technical data and identification of the equipment and manufacturer. The
technical data shown in this quick installation guide does not replace that shown on the labels attached to the equipment.
• PV source conductors must be Listed PV wire rated
1000V minimum per NEC 690.35.
• PV output conductors shall consist of sheathed
(jacketed) multi-conductor cables, or be installed in an
approved raceway. Conductors listed and identified as
Photovoltaic (PV) Wire may be installed as exposed,
single conductors per NEC 690.35. Output circuits
must be isolated from enclosure and system grounding.
Meeting these requirements is the responsibility of the
installer.
• The TRIO is designed without an isolation transformer
and intended to be installed per NFPA 70, 690.35 with
an ungrounded PV array and can be used only with PV
modules that do not require one of the terminals to be
grounded.
• All PV source and output circuit conductors must have disconnects complying with NEC, Section 690, Part III.
• To reduce risk of fire, connect only to circuit provided with a maximum branch circuit overcurrent of 40A for 20kW and 50A for 27.6kW in
accordance with NEC (ANSI/NFPA 70). See Maximum AC OCPD requirement in Technical Data table, Section 17.
• The end user is responsible for providing circuit protection for the inverter's AC output conductors.
This inverter has been factory programmed to automatically disconnect from the utility distribution system in compliance with UL 1741
and IEEE 1547 specifications. Default voltage and frequency trip limit and trip time settings to comply with these standards are shown
in table below. The Service menu can be used to adjust Voltage and Frequency Trip Limit and Trip Time Parameters according to Grid
requirements of installation locale. Refer to technical manual for instructions to use the Service menu.
Simulated Utility Source
Voltage (V)
A
< 0.50 Vnom (Fixed)
B
0.50 Vnom ≤ V < 0.88 Vnom (Adj. Set Points 55% to 88%)
C
1.10 Vnom < V < 1.15 Vnom (Adj. Set Points 110% to 115%)
D
1.15 Vnom ≤ V(Fixed)
E
Rated
F
Rated
G
Rated
H
Rated
Components shipped with all models
3 pin connector for configurable relay
9 pin connector for communication
and control signals
L-key, TORX TX20
Type A (Chengdu Reliance) and
Type B (ABB) jumpers for parallel
input mode
Type A
Type B
TRIO-XX.X-TL-OUTD-S-US-480
TRIO-XX.X-TL-OUTD-S1-US-480
SWITCHBOX COMPONENTS
09
Communication board
10
Service cable opening with plastic threaded plug, trade size 1/2"
11
DC cable openings with plastic threaded plug*, trade size 1", 1 ½"
13
DC terminal block (-S version)
14
DC disconnect switch handle
15
Class II DC surge protection (-S1, -S1A, -S1B versions)
16
AC cable opening, plastic threaded plug, trade size 1"
17
AC terminal block
18
AC board (behind 19 in -S1A and behind 20 in –S1B
* If a 2" conduit is needed for DC cable, DC cable entries can be punched to ccommodate using a knockout hole punch in location of existing knockouts.
TRIO version -S with AFD
Switchbox components with AFD
All
-A
detection board 29. Non-AFD versions include
the rail mounted paralleling terminal blocks 30
and 31.
Only non-AFD models are permitted to be wired
in parallel mode.
With the exception of paralleling inputs, wiring
instructions for versions with AFD are the same
as versions without AFD, although 29, 30 and 31
may not be shown.
Main symbols used in the guide and on the products
UL 1741; CSA-C22.2 No. 107.1-01
Hazardous voltage
ø
System earth conductor
(main grounding protective earth, PE)
Grounding (earth)
Max.time (sec) @60Hz before cessation
Frequency (Hz)
of current to simulated utility
Rated (60 Hz)
0.16 (Fixed)
Rated (60 Hz)
2 (Default)(Adj. Set Points 0.16 to 5 sec)
Rated (60 Hz)
1 (Default)(Adj. Set Points 0.16 to 5 sec)
Rated (60 Hz)
0.16 (Fixed)
f>60.5Hz (Default)(Adj. 60.2 to 63.0 Hz)
0.16 (Default) (Adj. 0.16 to 300 sec)
f<59.3 Hz (Default)(Adj. 59.8 to 57.0 Hz)
0.16 (Default) (Adj. 0.16 to 300 sec)
f < 57.0 Hz
0.16 (Default) (Adj. 0.16 to 300 sec)
f > 63.0 Hz
0.16 (Default) (Adj. 0.16 to 300 sec)
QTY
Components shipped with all models
2
Mounting kit
(1) bracket for wall
mounting,
4
(10 each) wall
anchor, screw,
washer,
(1) locking screw for
securing wiring box to
1
mounting bracket
2 ea
TRIO-XX.X-TL-OUTD-S1B-US-480
TRIO-XX.X-TL-OUTD-S1A-US-480
19
Class II AC surge protection (-S1A version)
20
Fused AC disconnect switch (-S1B version)
22
DC fuse holders (-S1, -S1A, -S1B versions)
27
Equipment ground conductor (EGC) busbar (DC
equipment grounding bar is common with the AC side; NO
interconnecting jumpers are required)
28
AC ground terminal
29
Arc fault detection (AFD) board
30
Positive input paralleling terminal blocks (use with non-AFCI
versions only)
31
Negative input paralleling terminal blocks (use with non-AFCI
versions only)
TRIO -S1, -S1A, -S1B with AFD
versions
include
the
arc
fault
General warning - Important
safety information
Hot surfaces
Phase
Direct and alternating
currents, respectively
QTY
1

Advertisement

loading

Summary of Contents for ABB TRIO-20.0-TL-OUTD-US

  • Page 1: Important Safety Instructions

    • Do not install in direct sunlight. If the preferred TRIO-XX.X-TL-OUTD-S1-US-480 TRIO-XX.X-TL-OUTD-S1A-US-480 mounting location is in direct sunlight, install the ABB Sun Shield on the inverter in order to provide the necessary shade. • Due to acoustical noise (about 50dBA at 1 m) from inverter, do not install in rooms where prolonged presence of people or animals is expected.
  • Page 2 Use the second jumper to connect the two terminal blocks labelled as +TB1 +TB2 (positive polarity of MPPT1 and MPPT2). Depending on the brand of the terminal block (Chengdu Reliance or ABB) mounted inside the string combiner box, two different types of jumpers are provided in the product’s accessory bag, as shown below.

This manual is also suitable for:

Trio-27.6-tl-outd-usTrio-27.6-tl-outd-us-aTrio-20.0-tl-outdTrio-20.0-tl-outd-us-aTrio-27.6-tl-outd