Advertisement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DZ959F8 and is the answer not in the manual?

Questions and answers

Summary of Contents for EAGO DZ959F8

  • Page 2 1. Please read and follow these instructions carefully 2 Power supply should be in accordance with local standard of ground-fault protection (GFCI) Please test Ground-fault before using product. 3. Ground wire of product should be connected to permanently fixed ground 4.
  • Page 3 1. 1/2” Elbow 4. Ventilator Fan 5. Color LED Light 8. Shower Head 7. Stainless Steel Bracket 12. Thermostatic Faucet 13. Body Massage Jet 15. Steam Port 14. Steamer Cleaning port 17. Wood Floor Inlay 20. Plastic Flex Drain 22. Panel Left Fixed Door Hinge...
  • Page 4 Stainless Steel Bracket:5pcs 25. Door Handles 30. Speaker 4x50mm Screw with Washer:4pcs 29. White LED Light 2.5mm Allen Wrench:1pc 3mm Allen Wrench:1pc 32. Hand Shower Pole 4mm Allen Wrench:1pc...
  • Page 5 Electrical Junction Box...
  • Page 6 Install the shower base: Install the back Panels: 1. Take the shower base out of the carton and put it on 1. Move the base away from the walls to allow room to get behind the floor carefully. the shower to fasten the walls and make connections. 2.
  • Page 7 Fixed Door Hinge Panel...
  • Page 8 Fasten all the front clear panels and back panels: 1. Fit the 2 pieces of Aluminum profile moulding No.5 onto the No.3 fixed clear panels and No.4 side clear panel. Then use a philips screwdriver to fasten the 2 pieces of aluminum profile moulding to the No.1 side panel and No.2 back panel with 4x50mm self- locking screws. As illustrated in Drawing C1 and C2.
  • Page 9 Install the moveable Door: 1. Put the top cover on the shower, and fasten the top cover to the No.1 and No.2 Panels with 4x10mm Screws and stainless steel brackets. Illustrated in Drawing A. Then fasten the top cover to the top frame No.3, No.4 and No.5 with 4x10mm screws and stainless steel brackets Illustrated in Drawing A2.
  • Page 10 Install Accessories: 1. Install the rubber top door seal (picture A) to the top of the Door. 2. Install the side Rubber seal (picture B) to the left side of the moveable door. 3. Install the bottom rubber seal (picture C) to the bottom of the door. 4.
  • Page 11 Connect Wires: 1. Caulk the 2 pc of top aluminum profiles and glass. Illustrated in Drawing A. 2. Put the wood floor in the steam shower along with stool. 3. Match the Ventilator Fan Sign, Lamp sign and speaker sign on the wiring harness to the relative wire connectors on the roof as illustrated.
  • Page 12 Install all hoses and steam tubes, drain tube, and hot and cold water lines. Check all fittings are tight and all electrical connections are correct before applying water or power to the unit. Note: Disregard white wires coming from back of Keypad, They are utilized for testing purposes at the factory only Exhaust Fan Ceiling Shower...
  • Page 13 ¹¼¼°° Press to switch on the steam room, press again to switch it off . The steam room will shut down in 60 minutes automatically. As picture1...
  • Page 14 This Key has 2 functions. When the radio is turned on, This key shows the frequency function. Press the key again and it will switch from the frequency function to the volume function. Press the key, and the display will show like (pic 10) for frequency mode or (Pic 9) for volume mode.
  • Page 15 Instructions For Cleaning The Steam Generator Procedure: Turn off power to the shower, Then open the cap on the Cleaning port on the wall of the shower. Put approx ½ cup of Vinegar in the cleaning port and put the cap back on the cleaning port and let vinegar sit for 10-15min in steamer.
  • Page 16 Model Number 1. Low inlet water pressure 1. Check the inlet water Pressure 2. Blockage in water inlet 2. Clean the filter at water inlet Water Diverter 1. Replace Diverter Valve Valve can’t divert Water 1. There is no power to the unit 1.

This manual is also suitable for:

Dz960f8

Table of Contents

Save PDF