Flue Manifold Installation - Rinnai EX08C (RHFE-202FTA) Operation And Installation Manual

Gas direct vent wall furnace
Table of Contents

Advertisement

Available languages

Available languages

Flue Manifold Installation

• The flue manifold must exhaust to the outside. Do
not exhaust into other rooms.
• The flue manifold is not designed to be positioned
under floors or below the heater.
• The termination cannot be vertical.
1. Disassemble the flue manifold
The flue consists of 3 parts:
• sleeve
• inside connection
• outside terminal
Disassemble the flue manifold by first pulling
out the inside connection. To remove the
outer terminal pull and release the two
internal ties and then pull out the outer
terminal.
Clearance to combustibles for the sleeve and
flanges is zero inches.
2. Adjust the sleeve length
Measure wall thickness through previously
drilled 3 1/8 inch (80 mm) hole.
The end of the sleeve should protrude 3/16 -
3/8 inch (5-10 mm) from the outside wall.
The sleeve is threaded for adjustment. Adjust
the sleeve length to wall thickness plus 3/16 -
3/8 inch (5-10 mm).
NOTE: Do not extend beyond the red line.
For other than the "S" type flue manifold, if a
shorter length is necessary an extension can
be removed. Cut the outer plastic laminate
(with a utility knife or similar) and remove the
extension. The metal should not be cut.
3. Attach the sleeve
Attach to the inside wall using 3
screws arranging the flange so that the
marking "TOP" is at the top.
The flange is offset 2° to allow the
condensate drain to the outside.
Inside Connection
3 screws
Rinnai Corporation EX08C, EX11C Manual
• This appliance can only be used with one of the
five types of Rinnai flue kits. The flue kits and their
dimensions are listed in the Specifications section.
• Refer to the Flue Terminal Clearances section.
Sleeve
Terminal
Remove extension
if necessary
sleeve should
extend 3/16 -
3/8 in (5-10
mm)
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents