Troubleshooting Flow; How To Check Inverter/Compressor; Check Of Open Phase; Check Of Compressor - Mitsubishi Electric MUZ-AP25VG - E1 Service Manual

Outdoor unit, split-type air conditioners
Table of Contents

Advertisement

12-5. TROUBLESHOOTING FLOW

A How to check inverter/compressor
Disconnect the connector between the compressor
and the power module (IC700).
Check the voltage between terminals.
Are the voltages balanced?
Yes
Check the compressor.
B Check of open phase
● With the connector between the compressor and the power module (IC700) disconnected, activate the inverter and check if
the inverter is normal by measuring the voltage balance between the terminals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 9-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board fl ashes 9 times. (Refer to 12-6.1.)
C Check of compressor
Refer to 12-5.

"Check of compressor

winding".
Is the compressor normal?
Yes
Refer to 12-5.
"Check of compressor
operation time".
Does the compressor operate continuously?
Yes
OK
OBH789
No
Measure AC voltage between the lead wires at 3 points.
No
No
See 12-5.

"Check of open phase".

Replace the inverter P.C. board.
See 12-5.
"Check of compressor".
Replace the compressor.
Refer to 12-5.
"Check of compressor start failure".
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents